Add 1 wall in basement area to enclose merchandise storage.
-
Apr 1994
Demolition floor slabs for shafts and foundation demolition store front.
-
Apr 1994
Seismic upgrade 104 f.
-
May 1994
Renovate existing building code elements arch struct. mechanical #9406694.
-
Jul 1994
Post street & maiden lane facade renovation.
-
Aug 1994
Retail store improvement on 1/f & 2/f n/b walls.
-
Nov 1994
Cti-1 3/f el me sp.
-
Nov 1994
Cti 1 4th floor el me sp.
-
Aug 1995
T.i. in existing building. about 2, 000 s.f. use as a hair salon.
-
Mar 1996
Cti-1 5/f el me sp.
-
Apr 1996
Cti-1 (el me sp) 6th fl.
-
Apr 1996
Cti-2 (el me sp) 6th fl.
-
May 1997
Expand exist hair salon about 1000 sq ft in 5th floor.
-
Apr 2003
Selective demolition of jewelry counter & expansion of jewelry counter.
-
Nov 2012
Demolition & construction of non load bearing partitions, relocation of plumbing, millwork, light fixtures, new finishes. electrical, plumbing & life safety separate permit.
-
Aug 2018
Rooftop: a/c unit replacements, like for like, in-kind (2xa/c + 2 condensors). maher n/a.
-
Feb 2019
Prepare space for t.i. work. remove interior partition walls, ceiling lights, sofitts and wall cladding. remove existing mechanical equipment. hvac shaft, plmg to riser shaft and capp all unsued lines. install lghtg per plan, patch, polish and seal concrete floor per plan. n/a for maher.
-
Jan 2020
Demolition and replacement of restrooms on 3rd & 4th floors. plumbing fixtures & accessories to be removed and replace in-kind.
-
Jan 2020
1st floor: demolition and replace of lobby at maiden lane. no exterior storefront work. n/a for maher.
-
Jan 2020
Demolition & replace of maiden lane ground floor storefront with proposed. ** maher: n/a **.
-
Sep 2020
3rd floor. full floor tenant improvement. new non-load bearing partitions, lighting, ceiling, millwork finishes and mep.
-
Sep 2020
4th floor. full floor tenant improvement. new non-load bearing partitions, lighting, ceiling, millwork finishes and mep.
-
Oct 2020
Demolition of existing dumb waiter and existing grand stairs floors 1 & 2. strutural infill of atrium and dumb waiter shaft. no changes to storefront or basement.
-
Oct 2020
Demolition or removal of 2nd floor existing flooring, casework, partition walls, ceiling, lights and soffits - mechanical equipment removal ab-017.
-
Oct 2020
Demolition or removal of 1st floor existing flooring, casework, partition walls, ceiling, lights and soffits - mechanical equipment removal ab-017.
DBI holds 87 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 87. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 126–130 Post Street Same street
- 150 Post Street Same street
- 45–47 Kearny Street Same block
- 49 Kearny Street Same block
- 185 Post Street Same block
- 69 Maiden Lane Same block
- 101 Kearny Street Around the corner
- 220–288 Grant Avenue Around the corner