126–130 Post Street
Financial District · San Francisco, CA 94108
Permit history
-
Jun 1981
Additions alterations or repairs.
-
Nov 1984
Dimolition new partitionsm, altered light & power.
-
Jan 1990
Re - roofing.
-
Jan 1997
Handicap access upgrade compliance, barrier remove only.
-
Sep 1997
Reroofing.
-
Oct 1997
Tenant improvements.
-
Oct 1997
Alterations to fire protection systems.
-
Jan 1998
Remodel existing store into salon install rms center spa.
-
Jan 1998
Oti-1 floor 3rd el me sp.
-
May 1998
One-stop, interior tenant improvement, fire prot under separa.
-
Jul 1998
4th floor t.i. work, new partitions, upgrade restrooms, phones.
-
Apr 1999
Non-struct interior tenant improvements partitions/ele, plumb.
-
May 1999
Oti-2 el 3rd floor.
-
Dec 2002
Oti-1 6th fl el, me, ls, sp.
-
Jul 2005
New exterior awnings. interior improvements/fixture, ceiling remodel, floor covering, ceiling.
-
Nov 2006
Oti-1, 5th floor, el, ls, sp.
-
Jan 2007
Tanner hecht: oti-2 5th floor el.
-
Apr 2007
Change scope of work, was to move exist roof top mechanical units, patch roof then build new steel frame support structural &place existing units back to orig location on new support structure.this was approv by bd 12/6/06.install new support for hvac. rev to 200507198062.
-
Jun 2014
New storefront entry, signage under separate permit. no other work.
-
Jul 2014
T.i. of an existing retail store, work includes new partitions, fitting rooms, wall fixtures, finishes, lighting, power & hvac duct distribution, no exterior work under this pa.
-
Aug 2014
4th floor: t.i. to existing day spa space. improvements include new offices, conference room, storage, restrooms and kitchenette. mechanical, electrical, plmg, fire sprinkler and life safety permits under seperate permits.
-
Oct 2014
2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build.
-
Feb 2019
Partition wall for the office. paint and carpet.
-
May 2021
Renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room.
-
Aug 2021
1/f: rev to 202105210819: add waterless urinal to unisex restroom. reconfiguration of celiing clouds & lighting. no exterior changes.
DBI holds 95 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 95. 1 of them are nominal $1 street-space or sidewalk permits.