117 Post Street
Store building
-
1906
Built.
-
November 19, 1908
Pacific cornice works contracted for galvanized iron, skylight and roofing on a building for the Edward Barron estate company, at $1,951.
-
Mar 1995
Comply with umb ordinances.
-
May 1995
Interior demolition work in preparation for seismic work.
-
Jun 1995
Scope: electrical, sprinkler, plumbing & mechanical.
-
Aug 1995
Structural upgrade all floors all h.c. accessibility issues.
-
Sep 1995
Non-struct tenant improv (int) mechanical/electrical/arch/fire protect.
-
Aug 1998
Remodel per plans ceiling flooring new wall & door.
-
Apr 2006
Remove portions of each floor to accomodate for the proposed elevator. new unisex bathrooms for 3rd - 6th floors. existing stair opening at the 3rd floor level shall be infilled with concrete. permit application 9504517 & permit application 9514123.
-
Oct 2006
Nonstructural interior tenant improvement. new partitions. new gyp ceiling on 1st and 2nd, new lighting, new restrooms, existing mechanical. system to be retained. sprnkrs and fire alarm under seperate permit. no exterior work.
-
Nov 2006
Revision to permit application 2006/05/27/5170. remove existing alum - glass storefront. install new door. glass & storefront. replace concrete slab @ door entry drywall partitions & ceiling in lobby. electrical on separate permit.
-
Dec 2006
Installation of new fire alarm system (core & shell).
-
Jan 2007
4th floor-ref permit application 200604179172-patch & repair floor, interior demolition on 4th floor only. construction walls in confderence room, new idf room and coffee station. no structural work.
-
Feb 2007
Work on 4th floor. wrap columns with gypsum boards existing walls to structure above to be furred. no structural work.
-
Apr 2007
Addition to existing fire alarm system, installation of 6 smoke detectors, 2 strobes and 3 horn/strobes due to a tenant improvement on the 4th floor.
-
May 2007
Additions to the existing fire alarm system due to a tenant improvement of the basement, first and second floor.
-
Oct 2007
5th floor-new full floor t.i. minimal demolition. construction of new walls, doors and partitions. trades to follow: mechanical, electrical, life safety under seperate permits.
-
Oct 2007
6th floor: minor, non-structural partitions, electrical, mechanical & life safety on separate permit if needed.
-
Dec 2007
Electrical for ti, new and replacement lighting. refer to permit application 2007/10/25/6488 for architectural ti work.
-
Dec 2007
Install four tie-down window washing anchor on the roof. all to be welded on existing steel structure.
-
Mar 2008
Lighting to be adjusted accordingly, some milkwork in office space on 2 floors 3rd & 4th. selective demolition, new walls, ceiling, flooring & paint.
-
Jun 2014
3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required.
-
Aug 2017
Architectural renovation of kitchen on the 4th floor. replacement of cabinetry, replacement of carpet with new laminate floor(kitchen only).
DBI holds 72 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 72. 5 of them are nominal $1 street-space or sidewalk permits. 4 expired permits are not shown.
Nearby
- 98 Post Street Same street
- 126–130 Post Street Same street
- 135 Post Street Same block
- 49 Kearny Street Same block
- 45–47 Kearny Street Same block
- 25–35 Kearny Street Same block
- 101 Kearny Street Around the corner
- 30–66 Kearny Street Around the corner