37.7883, −122.4049 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0310, Lot 016 · ZIP 94108

80 Maiden Lane

Store building

  • 4 stories
  • 4,275 ft2
  • 897 ft2 lot area
  • 2 residential units
  • 5 rooms
  • 3 bathrooms
  • Zoned C3R
  • Historic resource
37.7883, −122.4049 Street View appears here once a Google Maps embed key is configured.
  1. October 22, 1908

    Thomas H. Day's Sons contracted for store fronts on a building for Sommer & Kaufmann, at $1,810.

    The San Francisco Call, 22 October 1908, p. 13
  2. 1909

    Built.

  3. Mar 1990
    Permit 9003784 $$$ $4,600

    Clean existing basement add new gyp board partitions.

  4. Mar 1990
    Permit 9004009 $$$ $150,000

    Renovation of ground floor (st level) add new gyp bd const.

  5. Mar 1990
    Permit 9004122 $$$ $3,500

    Replacement of existing awning with new awnings.

  6. Aug 1990
    Permit 9016688 $$$ $450

    Add 12" high canvas apron to existing awning.

  7. Aug 2002
    Issued Permit M21603 $$$ $22,000

    Streetspace.

  8. Jul 2007
    Permit 200707277979 $$$ $66,000

    1st floor. t.i. remodel of existing tenant include interior demolition of a wall & cabinets. build back new design of cabinets etc. mechanical & electrical included. exterior windows & doors to remain.

  9. Oct 2007
    Issued Permit 200710195910 $$$ $1

    1st floor - revision to permit application 2007/07/27/7979 to delete restroom wall extension on the ground floor.

  10. Dec 2007
    Permit 200712130428 $$$ $3,400

    Fabricate & install - 2 total each triangle awnings, steel tube frames, canvas acrylic covers. share plans with 2007-12-13-0429 (sign permit application).

  11. Dec 2007
    Permit 200712130429 $$$ $3,200

    Sign permit - non electric, projecting, single faced. 2 each sign with "christofle" 1x on each awning 12"x48".

  12. Oct 2008

    Renew permit application 2007/10/19/5910 to obtain final inspection.

  13. Oct 2013
    Issued Permit 201310229920 $$$ $87,000

    Interior remodel of existing retail showroom. new fixtures, finishes. upgrade to existing acessible restroom.

  14. Feb 2014
    Filed Permit 201402078112 $$$ $1

    Revision to 201310229920. remove non existing fire devices from plan.

  15. Oct 2023
    Filed Permit 202310199075 $$$ $2,500

    Storefront ave compliance check. barrier removal - addition of power door operator at storefront entrance. abe#: 201811292655.

  16. Oct 2023
    Filed Permit 202310259486 $$$ $3,000

    Storefront entrance ada compliance checklist. barrier removal - addition of power door operators at storefront entrance. encroachment of power door swing into row. ref 23mse-00450.

  17. Oct 2023
    Issued Permit M1232128 $$$ $280

    Per bana inc request, add address 80 maiden lane to apn 0310/016 for studio address.

DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 1 of them are nominal $1 street-space or sidewalk permits. 9 expired or cancelled permits are not shown.

Nearby