259 Post Street
Store building
-
1909
Built.
-
April 15, 1909
Pacific fire extinguisher company and Otis elevator company contracted for automatic sprinklers and elevators on an eight-storey and basement class A building for the Hobart Estate company.
-
Jun 1982
Building use: office/retail.
-
Jan 1990
E.w.o.
-
Mar 1990
Floor slab removal for new elevator, t/i for 1/f.
-
Apr 1990
Replace exterior veneer with new material along post street.
-
Dec 1994
Install elevator(access appeals agremnt)94-37.
-
Feb 1998
Oti-1/7th floor, el, me, ls, sp.
-
Jun 1999
Oti 1, 5th floor, me, s, lt & ls.
-
Aug 2001
M.b.p - first floor & basement.
-
Dec 2001
Upgrade fire alarm system to new system with voice capability for entire building.
-
Jan 2007
Replace finishes on walls, floor, and ceiling. furnish and install new t-24 hc compliant guard's desk. minor non structural demolition, exterior finishes, minor drywall furning. elctrical on separate permit. sprinkler and fire alarm under sep. permit.
-
Jun 2012
5th floor-t.i. to consist of demolition non bearing partitions, new partitions, electrical, hvac, plumbing, acoustical ceilings, sprinkler & finishes. m.e.p under seperate permits. all work on 5th floor.
-
Sep 2012
Reroofing.
-
Sep 2013
T.i. of interior retail space. work includes new convenient stair, non-structural partitions, ceiling, finishes, mechanical and plumbing. no change in use. interior work only.
-
Aug 2018
Barrier removal at existing service elevator, including access compliant smoke doors, raised elevator entry sill, doors, frames & adjacent rated shaft elevator call buttons. rebuild access to penthouse and penthouse floor. streeet entrance under separate permit.
-
Feb 2019
Selective interior t.i. limited to construction of 2 new offices and modification of a conference room to make 2 smaller conference rooms and casework addition at existing break area. work on 5th floor. total work area 573 sq ft.
-
May 2020
Fire alarm system replacement for elevator upgrade. add a new panel, amplifier panels, radio cellular, smoke detectors, duct detectors, pull stations, modules, relays, remote power supplies and notfication appliances. ref permit application 202001292983.
-
Jun 2021
Minor permit to alter application submitted for planning review for window washing davits & safety railing installation on roof level of existing building.
-
Mar 2023
Facade repairs concrete & cement plaster repair. painting of facade & fire escape.
-
Jun 2023
1/f & mezz: t.i., demolition nonstructural partitions, removal of existing259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep.
-
Jun 2023
Demolition and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systems.
DBI holds 163 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 163. 4 of them are nominal $1 street-space or sidewalk permits. 5 expired permits are not shown.
Nearby
- 246–250 Post Street Same street
- 275–299 Post Street Same street
- 245–255 Post Street Same block
- 237 Post Street Same block
- 140 Maiden Lane Same block
- 134 Maiden Lane Same block
- 345 Stockton Street Around the corner
- 355–369 Sutter Street Around the corner