275–299 Post Street
Financial District · San Francisco, CA 94108
Permit history
-
Aug 1988
Install new canvas awnings over 2nd floor storefront windows.
-
Sep 1989
Reroofing.
-
Dec 1990
Alteration to existing office space on 5th floor.
-
Jun 1992
T/i 1/f demol new marble facing & entry doors structural.
-
Aug 1993
Cti i 4th floor.
-
Jan 1994
Revise to app #9209926.
-
Mar 1994
Tenant improvements, demolition, relcoate basement.
-
Jul 1996
Replace rooftop general advertising sign.
-
Feb 1997
New casework, carpeting, painting, demolition old casework, electrical.
-
Sep 1999
New partition walls drywall repair electrical lighting.
-
Sep 2000
Commercial tenant improvement.cln frt entry new int soffits, new floor/finish, lightng, rework mechanical syst.
-
Nov 2003
Reconfigure partition walls in office space, there is no electrical, plumng or mechanical involved in this proje.
-
Jun 2008
Provide new fixtures & finishes in sales area, update sales area lighting, provide new finishes & plumbing fixtures at toilet room, no work to be done in basement & mezzanine level, no work to be done on hvac/mechanical equipment.
-
Jun 2012
#600- non-structural interior demolition ab-017.
-
Jul 2012
#600- demolition(under separate permit), t.i. of jewelry store with new walls & casework. electrical as required. h.c. bathrooms upgrade, preparation, door & hardware, framing, metal/steel, carpentry, sheetrock/wall board, backing supports, paint/stain, furniture, plumbing, lighting, electrical.
-
Oct 2012
Reroofing.
-
Dec 2015
Enclose two offices @ 3rd floor open office area.
-
Mar 2016
Basement - resupply class ii standpipe from domestic water supply.
-
Oct 2023
Removal of interior partitions, ceilings, sales floor fixtures, plumbing fixtures, electrical and finishes of a 3414 sq ft. existing store on 3 levels. no change of egress. ab-017: exception to requirements for disabled access to vacant spaces.
-
Nov 2023
Renovation of 3414 sq ft of existing mezzanine, 1st and cellar level consisting of complete tenant interior improvement. new construction including selected new partitions and ceilings, selected electrical and mechanical.
-
Feb 2024
Install 1 blade sign "breitling" (replace letters on existing blade).
-
Feb 2024
Install 2 building sign "breitling".
-
Mar 2024
Complete new tenant exterior including store front finishes.
-
Mar 2024
Installation of 2 heat pumps split systems with 2 outdoor units on roof, 2 fan coils within the mechanical mezzanine of the gr fl retail space.
-
Sep 2024
To satisfy nov 202427587 emergency call out- car ran into column. no structural damage. repair column, new framing, fire rated ply, new thin brick facade.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update