2301–2495 3rd Street
Dogpatch · San Francisco, CA 94107
Permit history
-
Apr 1992
Sheetrock, painting.
-
Apr 1999
Seismic upgrade to an existng umb structure-work in building are.
-
May 2001
One-stop: m.tjoe: install 3 clean rooms & associated equipment.
-
Feb 2004
2/f-new classrm for an educational facility new full height & partial gyb bd partitions new lighting.
-
Jul 2007
Interior alterations to existing restaurant. new partition walls in bathroom/dining/kitchen. upgrade entry to ada compliant. alterations to plumbing to satisfy health dept codes. no changes to building exterior.
-
Dec 2013
Build new grocery/deli at former warehouse space. provide new ada entrance/lift and new ada restrooms.
-
Sep 2014
T.i for new restaurant including kitchen, dining, new ada restrooms, havc, electrical, plumbing, mezzanine and platform, new fixtures and finishes.n/a for the maher ordinance #155-13.
-
Jan 2015
New cafe and finishing kitchen in existing shell space to support existing commercial kitchen. new raised patio area and new ada compliante restrooms with communal sink.
-
Sep 2015
Change of occupancy. tenant improvement for new restaurant including kitchen, dining area, new ada restroom, hvac, electrical, plumbing, mechanical, mezzanine, new dining mezzanine, new fixtrures & finishes. ** maher: compliance with ordinance no# 155-13 not required **.
-
Feb 2016
Remodel existing office suite. new light fixtures, new kitchenette, new phone rooms, conference room. 4th fl suite 434.
-
May 2016
Install new covered pedestrian bridge over 22nd st. to replace a pedestrian bridge that was removed in the 1950's. the new bridge will utilize the same existing openings as the previous bridge. on existing buildings either side of 22nd st. the bridge will include a full weather enclosure, roof walls. a sloped.
-
Dec 2017
Change of use from f-2 to a-2. ground floor - interior tenant improvement for new restaurant space will be limited to new mezzanine, commercial ktichen, bar, bathrooms & storage. no exterior work. n/a maher ordinance.
-
Jun 2018
Project consists of demolition of non structural elements only including interior partitions, millwork, doors, ceilings, powers, lighting, finishes in suite 270.build out new int partitions, doors, finishe, ceilings, lighting for open office spaces meeting rooms, lounge space, break area, male female restrm.
-
Jun 2018
Mep for permit application 201806151968. provide new waste, vent, hot water, cold water to all plumbing fixtures. install electric water heater. new wshps, new exhaust fan for restroom, new osa unit, building ef, idf split system & transfer fan. maher na.
-
Jun 2018
Electrical improvements referring to application #201806151968 n/a for maher= 2nd and mezz. mechnical 201806252784- sprinklers and fire alarm separate permit.
-
Nov 2018
Suite 271: remodeling of existing production, distribution and office space into an office space. new accessible toilet added. no eterior work proposed. no structural work. mep deffered. maher n/a.
-
Mar 2019
New tenant improvement for new manufacturing space, mezzanine & office. mep deferred submittal. n/a for maher.
-
May 2019
Mechanical work per pa 2019-0305-4412. hvac & cooling system for manufacturing space.
-
Dec 2019
Add new ac cooling unit at roof top, and upgade mechanical piping on 3 fl0ors making cooling tower more efficent n/a maher.
-
Aug 2020
Modify existing distribution space into a food processing and research space. new walk-in refridgerator. new electrical & plumbing layout.
-
Jul 2021
Suite 327 & 328: modifying an existing manufacturing space into a cancer research lab. no exterior facade changes.
-
Aug 2021
Suite #422: modifying an existing manufacturing facility to add a lab component. new accessible restroom and 2 staff kitchenettes. no exterior changes to exterior of building. no structural work. fully sprinkler unit suite #422.
-
Sep 2021
T.i. in suite 319 & 320: select demolition, construct of new interior walls, finishes, & relevant lighting. mep & fire life safety under separate permit.
-
Feb 2024
2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968.
-
May 2025
Commerical ti: interior remodel of existing restaurant space. non bearing partitions, finishes & furnishing + lighting in dining areas. remove existing bar for smaller service bar. accessibility improvements at bathroom & entry. existing commercial kitchen to remain, repair finishes. no mechanical work.
DBI holds 259 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 259. 25 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update