234–246 1st Street
East Cut · San Francisco, CA 94105
-
1929
Built as a concrete daylight-frame loft in the Art Deco manner.
-
Jun 1987
Tenant improvement, new corr. walls, doors, rotate lights.
-
May 1999
Combine 3 office spaces into 1 office space.
-
May 2000
Building prefab shelter on roof with antennas below building height.
-
Nov 2000
Oti-1 4th floor electrical, mechanical, sprinkler.
-
Apr 2001
Street space.
-
May 2002
Office tenant improvment add mens/womens shower/lockers mechanical/ltg permit separate.
-
Feb 2005
Oti-1, 1st floor, el, me, ls, sp.
-
Mar 2005
Oti-1 1st/fl-el, me, ls, sp.
-
Dec 2011
Unmanned wireless facility consisting of 12 panel antennas and associated equipment on the roof of the subject building.
-
Apr 2012
2nd, 3rd, 4th, roof - install new rooftop ac unit, boiler, hhw system & tie into existing ductwork in existing tenant spaces.
-
Jul 2015
Demolition of existing mezzanine, new 2nd floor in its place. demolition existing freight elevator, install new passenger elevator. new ada restrooms on 2nd floor. new roof deck & stair access to roof. structural upgrades as well. new windows on south facade. ** maher: compliance with ordinance no# 155-13 not required **.
-
Jun 2017
Tenant improvement at 2nd, 3rd, 4th, and 5th floors including office partitions, break area and new drinking fountains. updated fire rated doors/partition walls, @ stair vestibules n/a for maher.
-
Feb 2018
Existing fire sprinkler system t.i. 446 changed out sprinklers and 138 relocated sprinklers.ref app#201706018176, 201507272516, & 201711174290 n/a for maher.
-
Apr 2018
Remove verizon wireless sheltor on roof, install new platform on roof for view. verizon wireless outdoor equipment, install new 400 amp utility service for verizon wireless. no change to existing antennas.
-
Aug 2018
Fill in existing vaults in conjunction wiht dpw street improvements.
-
Sep 2018
Installing emergency responder radio coverage system (errcs) throughout building. basement-roof.
-
Nov 2018
T.i. of four floors for single tenant to include new non-load bearing partitions. mep deffered. n/a for maher.
-
Nov 2018
Ti of a full 3 floors for a single tenant to include new non-load bearing partitions mep deferred.
-
Dec 2018
Basement, 1st & 2nd floors. install new vrv fancoil system, branch selector box, new supply and return diffuser and independent air & water balancing. ref 201811024845. n/a for maher.
-
Dec 2018
Mep's for permit application 201811024847 architectural drawings. install new vav boxes, new supply & return diffusers and independent air & water balancing. n/a for maher.
-
Mar 2019
Ref # 2018-1226-9126: add/relocate and remove fire sprinkler per tenant improvements. 70 added, 103 relocated, and 75 removed total.(3rd to 6th floor).
-
May 2019
Basement, 1st & 2nd fl - install new vrv fancoil system, new branch selector box, new supply and return diffusers. ref permit application 201905080110.
-
May 2019
3rd, 4th, 5th, 6th fl - mechanical, electrical, plumbing, permit to install new fancoil system, branch selector, supply & return diffusers. new power, data, new lighting & controls. ref permit application 201905080099.
-
May 2019
Fls tenant improvement. install 49 ceiling strobes, 33 ceiling forn strobe, 15 wall strobe, 71 wall horn strobe, 1 weatherproof wall strobe, 40 smoke det w base, 8 duct detectors, 11 control relays, 3 booster panel, power supply, ref 201905130465, 2019105130464, mep 201905080110.
-
May 2026
A modification of existing verizon wirless unmanned telecommunication facility, removing (6) existing antennas & adding (5), and associated antenna mount and other eq removal and installation. patch, repair, paint building face and parapet wall after antennas, mounts, cables & cable trays removed.
DBI holds 127 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 127. 13 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. The 2008 survey of this district dates the building to 1929; the assessor dates the building on this parcel to 1900. Submit an update