505 Howard Street
East Cut · San Francisco, CA 94105
Public art
- Boy III — Thomas Houseago
Cast bronze with white patina finish; building lobby; Artwork is accessible during normal business hours, 8:00 a.m. to 7:00 p.m.; artwork is visible from Howard Street.
Thomas Houseago, born in Leeds, England in 1972, cast Boy III and its companion Sleeping Boy in white-coated bronze, a departure from the plaster he traditionally worked in. - Sleeping Boy — Thomas Houseago
Cast bronze; building lobby; artwork is accessible during normal business hours, 8:00 a.m to 7:00 p.m; artwork is visible from Howard Street.
Sleeping Boy is the reclining companion piece to Boy III; both are cast in white-coated bronze with casting marks left intentionally unsmoothed by the artist.
Permit history
-
Sep 1992
Sign.
-
Jun 2000
To erect 0 dwelling unit with 9 story new building.
-
Oct 2006
Erect 11 stories plus mechanical. penthouse office/retail/assembly parking building.
-
Apr 2012
Excavation & shoring for new building approved under permit application 2006/10/31/6514.
-
Feb 2014
5th floor tenant improvement of full floor with new bearing partitoins. mep, fire alarm & sprinklers on separate permit. compliance with ordinance #155-13 not required.
-
Mar 2014
North side of 4th floor and multi tenant corridor work will include new offices, conference rooms and break areas in addition to elevator lobby finishes. mep, sprinklers, fire alarm under separate permit. conviwence stairs under approve permit. horizontal ext under 201402259268/9272.
-
Mar 2014
South side of 4th floor tenant improvement new offices, conference room, break area, mep sprinklers, fire alarm on seperate permit. maher ordinance #155-13 n/a.
-
Apr 2014
3rd floor: full floor t.i. with new office and conference room partition and break area. new finishes, mep, sprinklers, fire alarm on seperate permit.n/a for maher ordinance #155-13.
-
Apr 2014
2nd floor: full floor t.i. with new office and conference rooms, partitions, break area, and new finishes. mep, sprinkler, & fire alarm on a seperate permit.n/a for the maher ordinance#155-13.
-
Dec 2014
Architectural t.i. in 2 ground floor spaces that have not previously been occupied. work includes new partitions, flooring, ceilings and millwork. mep, sprinkler and life safety as deffered submittal. n/a ordinance #155-13.
-
Jan 2015
T. i. on the 10/f to include new open work areas, offices & conference rooms, support & storage areas. mep under seperate permit. n/a ordinance #155-13.
-
Feb 2015
9th floor: t.i. to include new open work areas, private office conference rooms, support and storage areas. n/a for the maher.
-
Feb 2015
8th floor: t.i. to include new open work areas office and conference rooms, support and storage areas. mep under seperate permit. n/a for the maher.
-
Dec 2015
Ti project for the 6th floor. standard open office space with conference & meeting rooms, employee break room. mep, sprinklers & f/a separate permit. n/a for maher.
-
Jan 2016
1st time tenant improvement to level 7 and 8. part of 8th fl. new non load bearing walls. new doors, new ceilings, new finishes, new furniture, mep, sprinklers, fire alarm sep permit. new structural work. maher not req.
-
Jan 2016
First time ti to level 6 inlcuding new mep. addition of rooftop equipment. architectural structural under separate permit. ref pa 2015-1218-5489. n/a for maher ordinance no.155-13.
-
Jan 2016
New mep for 1st time tenant improvement to levels 7 & partial 8/f. arch. t.i. permit application 201601086655. n/a ordinance #155-13.
-
Feb 2017
Selective demolition of ceiling height partition and raised floor panels. new full height partitions and finishes mep under sep permit. new fsd and revision to smoke control.
-
Sep 2024
5th floor: interior tenant improvement. to include non-load bearing partitions, ceilings and finishes. mep under seperate permit. structural under separate permit. no cfc until mep and structural deferred submittals are permitted and completed.
-
Dec 2024
10/fl- ti demolition existing partitions (nonstructural) and replace with new partitions, new associated millwork, lighting, mep and bathroom upgrades structural upgrades on existing slab.
-
Oct 2025
Installation of phone booths throughout the 2nd, 3rd, and 4th floor.
-
Oct 2025
6th floor - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms.
-
Nov 2025
5th fl - millwork and equipment for back of house pantry. interior non-structural partitions, new finishes millwork.
-
Nov 2025
7th floor - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms.
-
Nov 2025
8th floor: .ti including - build out of new open work space, enclosed offices, meeting rooms, restrooms and pantry.
DBI holds 177 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 177. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants, when each artwork was installed and who designed the open space. Submit an update