Permit history
-
Feb 1982
Additions alterations or repairs.
-
Jun 2000
To erect office.
-
Oct 2002
Build out floors 2-5, first time build out in a new construction.
-
Mar 2004
Oti-1 3th fl-el, me, ls, sp.
-
Mar 2004
Oti-2, 3rd fl-el, me, ls.
-
Apr 2004
Oti-1 5/f el me ls sp.
-
Apr 2004
Oti-1 2/f el me ls sp.
-
Apr 2004
Oti-1 6/f el me sp ls.
-
May 2004
Oti-1 7th floor, el, me, ls, sp.
-
May 2004
Oti-1 10/f el sp ls me.
-
May 2004
Oti-1 9th floor, el, me, ls, sp.
-
Aug 2004
Build out of cafe, f/a, ansul, sprinkler under seperate permit.
-
Jul 2013
3rd floor-t.i includes demolishing of non structural partitions & building new non structural partitions. life safety work will be design build & submitted for permit seperatley (building fully sprinklered).
-
Oct 2017
Construction of non-structural partitions, door/frames/hardware, millwork, drywall and acoustic ceiling grid/tile, finishes, mechanical, electrical and plumbing. structural platforms. fire sprinkler & life safety under deferred submittal. maher n/a.
-
Oct 2017
Construction of non-structural partitions, door/frames/hardware, millwork, drywall and acoustic ceiling grid/tile, finishes, mechanical, electrical and plumbing. structural platforms. fire sprinkler & life safety under deferred submittal. maher n/a.
-
Oct 2017
2nd fl: construction of non-structural partitions, door/frames/hardware, millwork, drywall and acoustic ceiling grid/tile, finishes, mechanical, electrical and plumbing. structural platforms. fire sprinkler & life safety under deferred submittal. maher n/a.
-
Nov 2017
Construction of non structural partitions, doors/frames/hardware, millwork, drywall, acoustic ceiling/ grid finishes, horizontal exit, mechanical, electrical, plumbing structural platforms fire sprinkler and life safety under deferred submittal. n/a for maher.
-
Nov 2017
10th floor: construction of non structural partitions, structural partitions. mezzanine, non-egres stairs, doors, frames, hardware, millwork, drywall, acoustic ceiling grid/tile, finishes, mechanical, electrical, plumb, fire sprinkler & life saftey under deffered submittal. arch features under. separate permit.
-
May 2018
4th fl work includes construction of non structural partitions, doors, frames, hardware, mi9llwork, drywall, ceilings, finishes, mep. fire sprinkler under sep permit.
-
May 2018
8th fl ti work includes construction of non structural paritions, door, /frames, hardware, millwork, drywall, ceilings, finishes, mep fire sprinkler under sep permit food service rooms 837, 838, 839 under sep permit maher not req.
-
May 2018
9th fl work includes construction of on structural partitions, door frames, hardware, millwork, drywall, ceilings, finishes, mep. fire sprinkler under seperate permit.
-
Oct 2018
3rd fl: amep full floor ti -demolition of non-structural partitions, ceilings, finishes. construction of non-structural partitions, ceilings, finishes, millwork, acoustic ceiling, mechanical, electrical & plumbing. two new assembly spaces- break/lounge area 50 occ, training room (74or99 occ). maher na.
-
Feb 2025
3rd floor: non-structural demolition of office space. addition of prep kitchen to include walk -in cooler, cooking hood, dish clean, & misc. equipment. ancillary storage for mechanical equipment, grease interceptor & water heaters.
-
Feb 2025
3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep included.
-
Mar 2025
5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical, plumbing & structural included.
DBI holds 272 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 272. 2 of them are nominal $1 street-space or sidewalk permits.