522–524 Second Street
East Cut · San Francisco, CA 94107
Permit history
-
Feb 1984
Repair garage door-pacth conc. floor-replace broken glass pane.
-
Feb 1984
Build walls.
-
Nov 1988
Add new landing to exist stairway enlarge 2nd fl lobby.
-
Jan 1989
Install office partitions, electrical, space heater, re #8817251.
-
Feb 1989
Tenant improvements.
-
Feb 1989
To add a loading dock on taber alley.
-
Apr 1989
Construct approximately 40 linear feet of one hour wall.
-
Apr 1992
Under pining of adjacent building.
-
Apr 1992
Parapet reinforcement/bracing.
-
Apr 1993
Install steel angle and plywood on roof.
-
Apr 1996
Install 1/2 plywood roof sheathing over existing sheating.
-
Jun 1996
Reroofing.
-
May 1998
One stop: umb/comply/sfubc sec 3403.6 complete phase seismic.
-
Jun 2004
Renew#9808804 to complete for seismic retrofit of umb per. ordinance.
-
Aug 2005
This a revision to permit 9808804/r2 two accessible wc cbc 11348.1., 3.2 accessibel employee breakrms.
-
Nov 2006
Supply and install 1 new roof top hvac unit along with duct work and accesories. supply and install 3 exhaust fans.
-
Aug 2010
Tenant improvement-interior new parition walls, remodel & new restrooms, modify existing lighting & mechanical.
-
Mar 2012
To erect electric, single faced, door/window sign.
-
Apr 2014
Interior tenant improvement, new non-structural, non rated partitions, accessible wc, accessible break area. n/a ordinance#155-13.
-
Jul 2016
2nd floor: to to existing bld. new non structural non rated partitions & finish changes. mep on spe permit if needed. maher na.
-
Nov 2018
Demolition only ab-017 demolition delect non structural partitions, doors, frames, electrical maher na.
-
Nov 2018
Construct new non-structural partitions, door & frame and finishes, modification of existing power & signal. maher na.
-
Jun 2020
Interior t.i. of existing 1st fl space. installation of new non-structural partitions, doors and finishes. there will be no change in occupancy & no change in floor area. deferred submittals to be life safty/fire alarm, electrical, sprinklers, mechanical.
-
Aug 2020
Mechanical work to include installation of 1 new fan coil, 1 condensing unit, 1 rooftop unit. demolition, low pressure ductwork and refridgerant piping. no arch work. n/a maher.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update