22–24 South Park
East Cut · San Francisco, CA 94107
-
1910s
Run as the Eimoto Hotel, described in a published history of San Francisco's Japantown as a first stop in the United States for many Japanese arrivals, who landed at the nearby Piers 30–32 used by Japanese steamship companies.
-
Feb 1976
Created during job card conversion on: 04/19/84.
-
Dec 1983
Completed under 8411991.
-
Dec 1983
Install new fire protection system.
-
Nov 1984
Repair and alterations room walls, interiors plumbing.
-
Dec 1984
Repairs to roof and removal of interior plaster wall finish.
-
Feb 1985
Solar hot water system collector panels on roof.
-
Aug 1985
Remodel on existing deli install.
-
Nov 1996
Reroofing.
-
Apr 1997
Install res'l elev. to serve g/f & basement.
-
Sep 1997
Added new hdrs at elev. shaft of exisitng condition in field.
-
Nov 1997
Install 8 magntic door holders to existing fire alarm system.
-
Aug 2011
Fire alarm system upgrade. new system & sprinkler monitoring: 80 horn/strobes; 21 smoke detectors; 1 pull station; 2 modules.
-
Jul 2017
Residential: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642251, a residential hotel. maher ordinance not required.
-
Jul 2017
Commercial: seismic retrofit to comply with mandotary soft story ordinace per sfebc chapter 4d, asce41-13, to comly with nov#201642251, a residential hotel. maher ordinance not required.
-
Dec 2019
Rehab/renovaiton improvement to sro new interiors. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na.
-
Sep 2020
1st fl tenant improvement: add 1 and relocate 5 sprinklers to conform with the wall/ ceiling layout of the tenant improvement. ref permit application 201912189908.
-
Sep 2020
Modify existing fire alarm system.
-
May 2021
Revision to permit application 201912189908. sow: addition of power door operator in lieu of level landing due to existing site conditions. new casework in one unit. new utiliy sink at mep room. no other changes in this revision. no work in prow.
-
May 2021
1st floor: as-built for #2020-0904-3778. relocate (7) and change out (1) sprinkler. basement: add (3), relocate (7) and change out (4) sprinklers per t.i.
-
Jun 2021
As-built changes to approved plan (permit application 2021-0331-7660 r1). had to change legend symbol from wall to ceiling room horns and some hallway horn strobes. made some hallway h/s strobe only due to high sound levels, added a 2nd tamper switch, change both room h/s to strobe only, change make & model of lfh.
-
Sep 2021
Evacuation maps and installation.
-
Mar 2023
Repair exterior awning at madrid, new paint and laminated safety glass.
-
May 2023
Mitigate water infilltration at light well due to main water leaking into basement this includes removing bottom of siding, epoxy application to concrete, and waterproofing.
-
Jun 2023
Common areas/kitchens 2&3: add magnetic door holders on (2) kitchen doors, smoke detectors in (2) kitchen rooms.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update