181–187 Third Street
East Cut · San Francisco, CA 94103
Permit history
-
Feb 1996
Erect a 30 story hotel with restaurant.
-
Oct 1997
Revision to 9714405.
-
Dec 2004
Remove 11 guestrooms and install spa & manicure salon by removing interior walls.no structural work.
-
Dec 2004
Provide mechanical, electrical, and plumbing/4th floor t.i. under app #200412302351.
-
Feb 2007
392 guest rooms renovation. no changes to building envelope.
-
Jan 2008
Guest room suites renovation to 9 suites total. 6 jr. suites - floor 23-28. 3 extreme suites - floor 31. under separate permit: fire protection/fire alarm, sprinkler, hvac, electrical plumbing.
-
Jun 2010
31st. floor.; suites only; interior hotel rm. renovate. minor drywall demolition & repair. casework demolition. new furniture, millwork, paint & floor. covering. no change to clg./lighting/sprinkler. new shower installation. minor relocation of drywall partitions. existing mechanical./electrical./structure to remain, no ch.
-
Nov 2010
Add new steel-frame room with structural wall and roof framing, roofing, glazing. add plumbing fixtures to meet occupancy requirements, doors, finishes. note: fire sprinklers, electrical, hvac, life-safety on separate permits.
-
Apr 2011
Grnd floor: demolition of non load bearing walls, partial demolition of bathrm, renovation of main bar, construction of non-load bearing wall @resto, carpet flooring replace, add ada compliant toilet stall; level 2: demolition of doorwy, non-load bearing walls, add new ceiling system overexistingceiling of bar.
-
Sep 2011
Upgrade of 24 existing hotel guest rooms to 1991 ada/2010 cbc accessibility requirements. reuse existing structure, electrical, mechanical, building, components. relocation of existing plumbing supply and waste lines no change in use. no change to title 24 enery requirements.
-
Sep 2011
Interior barrier removal at existing hotel guest rooms only, 24 total guest rooms affected at various floors. minor plumbing work required to relocate some existing toilets, not change in use or occupancy.existingfire sprinklers unchanged intent to comply with 2010 c.b.c accessibility req'mts.
-
Apr 2013
Shoring tiebacks under east side of hotel for support of temporary excavation at lot to east.
-
Dec 2013
Renovation on 4th floor of w hotel in banquet hall and fitness center. work includes new fixtures, finishes, mep, infill existing pools with new structural slab. no exterior work, fire protection under separate permit.
-
Dec 2013
Renovation to public restroom and mechanical room on 4th floor of w hotel.no exterior work. mechanical, electrical, & fire protection under seperate permit.
-
Jun 2014
Replacement of 2 existing hot water heating boilers with new high efficiency furnace air boilers to meet air quality requirements.
-
Apr 2015
6th floor: renovation of 2 model guest rooms, 616 & 617 and adjacent corridor.
-
Jun 2015
Renovation 2nd and 3rd fl prefunction spaces, restrooms, corridors. work includes new finishes, electrical, av, ceilings, wall surfaces. no exterior, change to exiting, egress or occupancy. mechanical, plumb, fire sep permit.
-
Nov 2016
Ground floor: existing women's restroom remodel into communal lavatory area and 3 individual toilet compartments at hotel bar.
-
Feb 2018
Renovation of guest rooms, corridors & suites from 5th to 31st floors. work includes new showers, casework, finishes, int.signage, mep upgrades. guest room count to be revised from 414 to 401. no exterior work.
-
Aug 2018
Voluntary replacement of the existing fire alarm control panels (2 main and 4 remote units) and 2 annunciators. all existing 'field' devices will connect onto the new panels.
-
Aug 2018
Fire sprinklers: upgrade/replsace existing po2-lok systems on 27 floors (floors 5-31), 165 uprights, 1074 pendents, 480 sidewalls, 17119 heads total. ref permit application 201802201648.
-
Jul 2019
Demolition of existing spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades.
-
Mar 2026
Lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment.
-
Jun 2026
Upgrade bar equipment at existing lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref permit application 202603036811.
DBI holds 89 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 89. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update