April 4, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment. Shasta!, Hotel Morton and M&M Grocery were at the address.
-
Apr 1992
Install 8'ln ft of metal partion 8' high install 3x7 mtl dor.
-
Sep 2004
Oti-1 12/f, el, me, ls, sp.
-
Jan 2012
Interior lobby and ground floor office suite remodel. new exterior entry, glazing, doors, metal panel eyebrow. new lighting and finishes. exterior plaza remodel, new deck, planters, railings, and gate. relocate garage exhaust.
-
Feb 2012
4th floor-full floor t.i. includes construction of new partition walls, finishes, ceiling, electrical & lighting. demolition under permit application 2012-0207-3721. restrooms, life safety & sprinkler permits under seperate permits.
-
Mar 2012
Mep work to support lobby and plaza remodel. replace existing heat pumps, new lighting, powr in lobby. alteratio of existing ductwork, electrical, and plumbing. rerouting of basement level garage exhaust in plaza area.
-
Jun 2012
11th floor: new interior non-structural partitions, millwork, finishes, new open ceiling, light fixtures, electrical, plmg, rework existing mechanical.
-
Oct 2012
5th floor: full flor, single t.i. includes. selective demolition and construction of new partition walls, finishes ceiling, mec, electrical, plmg included in this permit. new communication stair under seperate permit. fire life safety and sprinkler upgrade under seperate permited as needed.
-
Apr 2014
Suite 1020: construction of interior t.i. on 10th floor. also install opening and non-egress stair between 10th and 11th floor. mep and fire, life safty deffered submittal. demolition under app# 201404012147.n/a for the interim control #428-13.
-
Jun 2014
Basemt 1st roof building improvement- install a new standby generator with 333 gal belly tank in bsmt, exterior fuel fill port, associated dbl contained fuel piping and tank vent lines, generator exhaust. new non-structural partitions. work include hvac, electrical, plumbing & structural.
-
Dec 2014
Full floor ti including partitions, ceiling and finishes. structural suppport at fire rated ceiling door at elevator lobby and overhead operable partitons system between 2 large conf rooms. access alarmed egress doors, mechanical, electrical, plumbing modificiations.
-
Mar 2015
Demolition of some existing partitions and doors. construction of new full height partitions, associated electrical power/lighting distribution, associated mechanical & plumbing, associated life safety changes, new shower and associated finishes.
-
Jul 2015
T.i. for new restaurant work includes, new partition, fixutres finishes, equipment, mep, and new bathrooms. no exterior work. fire protection under seperate permit. mep under seperate permit.
-
Dec 2015
6th & 7th fl. interior t-i. new conf rooms, private offices, phone rooms. added idf rooms on ea. fl; added men's, women's restrooms, open area work stns. added drywall ceilings & acoustical ceilings sealed concrete & carpet flooring misc millwork at pantry locations. life safety deferred.
-
Oct 2016
Interior t.i. on 4th floor, including new partitions, new & revise hvac - electrical - plumbing. structural scope to include movable partitions, and steel storefront system. see permit application 2016-1011-9903 for demolition.
-
Dec 2016
Interior ti including selective demolition, partition, electrical, ceiling, finish. mep work. maher na.
-
May 2017
8th fl - interior demolition of nonstructural partition and selective. demolition at restrooms, building new non structural partitions. mep includedl life safety, and sprinkler drawing under separate permit.
-
Aug 2017
8th fl - interior ti includes building new non structural partitions, new and revised meps and life safety work. structural scope to include movable walls and steel storefront systems.
-
Feb 2018
Ti on 2nd and 3rd floors to demolition and construct new partitions, framing, doors, millwork, ceilings & finishes. mep, life safety and sprinklers on separate permit.
-
Nov 2018
11/f: t.i. to include interior demolition of partitions, ceiing and finishes. construction of new partitions, ceiling and fixtures. mep under sep permit.
-
Mar 2021
Suite 1200 on 12/f: interior ti includes selective non structural demolition, new interior non load bearing partitions, mep and finishes.
-
Aug 2021
10/f: demolition of non-structural partitions, celing, lighting, millwork and finishes. new construction of non-structural partitions, ceilings, lighting, electrical millwork & finishes.
-
Mar 2022
10th fl: demolition of non-structural partitions, ceilings, lighting & finishes. new construction of non-structural partition, ceiling, lighting, electrical, millwork, and finishes.
-
Jun 2024
Prop h: new remodel of existing restaruant on the ground fl. demolition of walls, doors, ceilings, interior/exterior.finishes, fixtures, casework, storfronts, existingsignage, mep systems, newinterior front of fixures, bar, storefront, bar/grill equipment & exterior finishes.
-
Apr 2025
9/f: ti including- demolition of non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. new construction includes new non structural partitions, doors, sidelights, millwork, ceiling, lighting, and finishes. upgrades to existing restrooms and construction of new accessible.
-
Jul 2025
12 floor; t.i. on 12th floor. scope of work includes demolition of non-structural partitions, doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades.
DBI holds 436 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 436. 17 of them are nominal $1 street-space or sidewalk permits.
The assessor dates the building to 1983, after this photograph was taken. Not yet documented: the architect and builder and the early tenants. Submit an update