2 Harrison Street
East Cut · San Francisco, CA 94105
-
1925
Built.
-
1926
The Hill Bros. Coffee plant, designed by architect George Kelham; San Francisco Landmark #157.
-
Nov 1982
Building use: office.
-
Jun 1990
T/i to existing b2 space (base building done under seperate permit).
-
Jun 1991
Horizontal addition.
-
Aug 1991
New construction for office space to include electrical. & plumbing.
-
Dec 1991
New construction of wall, electrical. & mechanical for office.
-
Oct 2002
Oti-1 4th floor el me ls sp.
-
Oct 2002
Oti-1 3rd floor el me ls sp.
-
Oct 2002
Oti-2 4th floor, el, me.
-
Mar 2004
Oti-1 5th floor, el, me, ls, sp.
-
Apr 2004
Oti-2, 5th fl, me, el.
-
Jun 2005
Oti-2, 2nd floor, me.
-
Sep 2010
Fire alarm system upgrade (from honywell to est edwds), install 2 new modes, new smoke control panel, new audio amplifiers, new system devices on floors b1, 1st, 2nd, 3rd, 4th, 5th, 6th & 7th floors. audio/visual already complete on b-1. connect common garage area with 345 spear building.
-
Apr 2011
Interior tenant improvement, including drywall, ceilings doors, millwork, glazing, finishes. change of use to include adult educational facility. mep, demolition & structural, under separate permit.
-
May 2011
7th floor-selective demolition, new partitions, electrical outlets, lighting & finishes. add 2 new kitchettes.
-
Jul 2012
Change of use. interior tenant improvement at suite, 138, 156, 146, 238 including converting a-3 to b use.
-
Jan 2015
3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permit.
-
Jul 2015
2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a.
-
Dec 2015
T.i. in suite 201 including demolition and new partitions, ceiling, finishes, associated mep. fire life safty under seperate permit.
-
Oct 2018
4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area.
-
Oct 2018
3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls.
-
Dec 2018
4th floor - mep dwgs to support previously approved arch set 201810193678 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump.
-
Dec 2018
3rdflr - mep dwgs to support previously approved arch set 201810193680 adjust vav terminal and air terminal. new vav terminal and ductwork will be provided. new water resource heat pump.
-
Nov 2023
On street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out existing mortar from brick joints. repoint with new mortar to match existing in color and compressive strength. repair damaged bricks. paint windows and seal window permeters.
-
Dec 2025
3/f, 4/f, 5/f - partial demolition of non structural walls, ceilings and light fixtures. new construction of non structural walls, finishes and power. mechanical and electrical included.
-
Dec 2025
2nd fl: tenan improvement for existing 2nd fl. partial demolition and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph.
DBI holds 334 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 334. 5 of them are nominal $1 street-space or sidewalk permits. The assessor's roll gives 1925; this address is recorded as built 1926.