345 Spear Street
South Beach · San Francisco, CA 94105
Permit history
-
Jul 1990
Build cafe per plan.
-
Jan 2002
Oti-1, 6th floor, el, me, ls, sp.
-
Sep 2005
Oti-2 6/f el, me, ls.
-
May 2007
Oti-1, google, 4th floor, el, me, ls, sp.
-
Jul 2007
Full floor mechanical and electrical work. ref #200705252302.
-
Oct 2007
2nd. floor tenant improvement. t.i. remodel existing vacant space. build new walls for office and conference rooms. relocate existing lights, existing ceiling grid & tile to remain, patch as req'd. hvac, fire sprinkler, life safety, electrical., under separate permits.
-
Dec 2008
Fire alarm system upgrade. install 3 addt'l nodes (fcc room already complete) out of 4. new smoke control panel and new devices on floors: b-2, b-1, ground, 5, 6, 7, 8 and 8 thru 18. also connect common garage devices (33 sprinkler/strobes) @ 2 harrison street.
-
Aug 2011
Interior alteration for offices on floor 6 including drywall, ceilings, demolition, doors, millwork and finishes. mep under separate permit.
-
Aug 2011
6th floor-interior t.i. including new drywall, ceilings, doors, frames, glazing, millwork & finishes. mechanical, electrical, lighting, sprinklers & life safety under seperate permit.
-
May 2014
Tenant improvement on the 5th fl. new partitions, willwork, finishes. associated mep and sprinklers and life safety under separate permit.
-
May 2014
5th floor: mechanical and electrical associated with approved app#201405135585 including new hvac and lighting. n/a for the maher ordinance #155-13.
-
Jun 2014
Cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.
-
Jul 2014
7th floor: phase 1 of 2 interior t.i. including new partitions and finishes, mechanical and electrical and fire alarm and sprinkler under seperate permit. work includes new horizontal exit & reviseing smoke control report. ** maher: compliance with ordinance no# 155-13 not required **.
-
Aug 2014
T.i. on 3/f including new offices, conference rooms & restrooms. mechanical, electrical, fire alarm system & fire sprinkler system under seperate permit. n/a ordinance #155-13.
-
Aug 2014
Mep work associated with approved permit #201408184059. n/a maher ordinance # 155-13.
-
Jan 2015
7th floor: ti. include demolition, refurbishing of existing restrooms, new partitions & new ceilings. mep, fire alarm and sprinklers under separate permit. new occupant loads and pavers on roof. sffd assembly permit required.** maher: compliance with ordinance no# 155-13 not required **.
-
Jul 2015
2nd floor: to include new b-occupancy conference rooms, fitness area, locker rooms, new bathrooms and new finishes thoughout. mechanical electrical and fire life safety is under seperate permit. n/a for maher.
-
Jul 2015
Lobby upgrades to finishes on level 1 and associated lighting for signage in the lobby. n/a for maer.
-
Aug 2015
Mechanical and electrical work associated with 201507020572 including new lighting, new ductwork, and heat pumps.
-
Jul 2017
6th floor remodel, existing tech talk room, conference rooms 9 fire doors.
-
Mar 2019
6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher.
-
Jun 2020
Suite 120: tenant improvement-2800 sq ft medical abulatory care facility.
-
Nov 2022
4/f: tenant improvement and structural to support demolition permit. new partitions, ceilings, fixtures, millwork and finishes. ref demolition permit 202211106283. mep deferred.
-
Dec 2022
4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferred.
-
Dec 2025
Tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware.
DBI holds 540 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 540. 18 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update