75 Hawthorne Street
East Cut · San Francisco, CA 94105
Permit history
-
Sep 1983
New construction.
-
Apr 1989
Tenant improvements.
-
Feb 2013
5th floor-partial 5th floor tenant improvement-restroom upgrades, new partitions & finishes. minor structural work limited to server room & restrooms. new bollards in cellar level. m.e.p, sprinkler, fire alarm on seperate permits.
-
May 2013
Installation of new bms control system infastructure. install new chiller, boiler, cooling tower and associated equipment at the roof penthouse, 16th and 18th floor. structural and mep work only.
-
May 2013
New generator on penthouse roof & new disel fuel storage tank in sib-celler rated shafts for fuel lines. provide new roof hatch with access ladder and new guard rail at penthouse roof.
-
Dec 2013
3rd floor t.i. to an existing office space. includes selective demolition, new partitons, structural and mep. f/a and sprinkler under separate permit.
-
Dec 2013
10th floor t.i. to existing office space. work to include selective demolition, new partitions, structural and mep. f/a and sprinkler under separate permit.
-
Dec 2013
12th floor t.i. to an existing office space. includes selective demolition, new partitons, structural and mep. f/a and sprinkler under separate permit.
-
Dec 2013
Full floor tenant improvement for 14th, 15th & 16th floor. selective demolition, partitions, structural, mep, restrooms to be fully upgraded. fire alarm & sprinklers under separate permit.
-
Dec 2013
17/f, 18/f & 19/f full tenant improvement, selective demolition, partitions, structural & mep, remodel restroom, fire alarm & sprinklers on separate permit.
-
Dec 2013
8th & 9th tenant improvement. selective demolition, partitions, structural, mep, restrooms fully upgraded. fire alarm & sprinklers under separate permit.
-
Dec 2013
Full 1st&13/fl ti.partial 2/fl ti. restroom fully upgraded. mep, sprinkler, fire alarm & ti on separate permit. accessory child care use on grd fl. interim controls - market street & soma: permit for structural or architectural work above ground floor.
-
Dec 2013
Full 11th floor t.i. selective demolition, partitions, mep. structural limited to server room. sprinklers & fire alarm on separate permit. interim controls - market street & soma: permit for structural or architectural work above ground floor.
-
Dec 2015
2nd floor suite 2400: partial floor t.i. selective non-structural demolition, new partitions, minor structural, finishes, mep, ceilings, lighting. under seperate permits: fire sprinklers, fire life safety, restrooms, & elevator lobby.
-
Dec 2015
Full floor ti: selective non-structural demolition; new partitions, finishes, minor structural bracing, ceiling, secondary restrooms. under separate permits: mep, fire sprinkler, fire life safety, core restrooms, elevator lobby.
-
Dec 2015
Full floor ti: selective non-structural demolition; new partitions, finishes, minor structural bracing, ceiling, secondary restrooms. under separate permits: mep, fire sprinkler, fire life safety, core restrooms, elevator lobby. ab060 for idf room, controlled access egress and locked elevator lobby.
-
Jan 2016
6th floor: partial floor t.i. for mep scope of work. seperate permit: fire sprinkler, fire, life safty, resterooms, elvator lobby, architectural t.i. ab 060 compliant, adding fsd's through rated walls.
-
Feb 2016
7th/8th floor: partial floor ti, ref pa 2015-1231-6241: mep work. sep permits for fire/life safety/restrooms/elevator lobby/arch.
-
Feb 2016
Arch and mep plans with comm kitchen 4 new fsd's 1st and 2nd floors: partial floor t.i. conversion of office space to child care center. selective non-structural demolition, new partitons and finishes. close off and abandon 1 existing stair.
-
Jul 2016
Partial 2nd floor interior ti on multi-tenant floor improvements include partitions, electrical, mechanical, plumbing, ceiling, lighting, finishes, and life safety. no structural scope.
-
Jul 2018
Spec suite: ltg under sep perminterior ti on the existing unoccupied 20th fl. scope includes demolition and construction of non-structural partitions, doors interior glazing, ceiling, light fixtures millwork and finishes. no change in occupancy use or area, life safety & sprinklers under separate permit.
-
Sep 2018
The scope of work is for tenant improvement on the partial 5th floor of 75 hawthorne.includes demolition & construction of non structural partitions, doors, interioe glazing, ceiling light fixtures, millwork & finishes no change in occupancy life safety mechanical, electrical & plumbing under seperate perm.
-
Apr 2019
Interior ti on e unoccupied 4th fl, scope includes construction of non structural partitoins, doors, interior glazing, ceiling, light fix, millwork, finishes. floor was rpev demolished per 201705055777. no change in occupancy, use or area. mechanical, electrical, plumb, ls, sprinklers under sep permit.
-
Oct 2019
6th floor - int ti construction of non structural partitions, doors, interior glazing, ceiling, light fixtures, millwork and finishes. no change in occp/use/area. plm/fire/life safety under sep permit.
DBI holds 234 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 234. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update