95 Hawthorne Street
East Cut · San Francisco, CA 94105
Permit history
-
Jan 1985
Demolish existing one story wing of building including.
-
Feb 1985
Install underpinning piers & tiebacks.
-
Nov 1990
Demolition of existing office aprtitions.
-
Dec 1990
Seismic upgrade add exterior windows, toilet alterations.
-
Sep 1991
Remodel existing tenatn improvements.
-
Jan 1992
Remodel 2nd floor only.
-
Feb 1993
Remodel existing tenant improvement for office facility.
-
Feb 1993
Cti-2 fl03 (el me).
-
Jul 1993
Tenant improvement-office- partial 4th floor.
-
Oct 1994
Cti-1 4th floor el me sp.
-
Nov 1994
Cti-ii 4th floor el me sp.
-
Dec 1994
Remodel existing office space partial 3/f.
-
Dec 1994
Reroofing.
-
Oct 1996
Renovation of partitions, electrical lightings, outlets, duct (hvac).
-
Dec 1997
Ti partial 4th floor-total square footage alterations.
-
Jan 1998
Tenant improvement-2nd floor-partition, light fixtures/hvac.
-
Aug 2003
To install 6 solar collectors on roof & pipe to 3 storage tanks in existing boiler room to preheat.
-
Jul 2005
5 new offices with new ceiling and lighting and mechanical upgrade bathrooms to meet ada requirement.
-
Nov 2007
Remove existing non-structural precast concrete panel decorative fins in void space between buildings to increase clearance in seismic event. (voluntary seismic upgrade).
-
Jan 2008
5th floor: new passage way to 75 hawthorne st. new stair landing wheelchairlift.
-
Jul 2008
5th floor: tenant improvement includes building out a few full height and low height non structural partitions (new or revised life safety work will be design build submitted for pemti separately). building is non sprinklered lowrise.
-
Jun 2009
Demolition e ceiling and lighting, provide new suspended ceiling, lighting, fire protection system at gr floor childcare area. existing building not sprinklered. fire protection system is design build.
-
Apr 2011
5th fl ti includes barrier removal at public and employee restrooms, build out ceiling height non structural partitions, new or revised life safety and sprinklers work design build separate permit. (non-sprinklered low rise) mep in this permit.
-
Oct 2020
To erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4, 000 sq feet of ground floor retail.
-
Oct 2020
To demolition 5 story, 67' in height, 1 basement, b occupance, type 1 building.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update