606–612 Howard Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Merritt Building.
-
May 17, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment. Nanco; Spurgeon and Smith Company were at the address.
-
Feb 1982
Additions alterations or repairs.
-
Jul 1992
Reroofing.
-
Oct 1994
Revis to appr'd #9411428-constr handicap bathroom & partitio.
-
Jul 1995
Cti-1 2nd floor none.
-
Jul 1995
Ct-1 ground floor none.
-
Oct 1996
Cti - i 3rd floor.
-
Aug 1997
Seismic upgrade. anchors at floors & roof levels. stl frm.
-
Aug 1997
Const of mezzenine, partition walls, new lobby.
-
Jan 1998
Reroofing.
-
Mar 1998
New toilets-existingtoilets to conform with t-24 (ref.9716187).
-
Jun 1998
Oti el me sp 6/f.
-
Aug 1998
Oti-4th floor.
-
Oct 1998
New electrical vault, sidewalk & waterproofing.
-
Feb 1999
Upgrade to existing stairs, elevators, & corridors to meed codes.
-
Oct 1999
Replacement of existing service elevator, upgrade to shaft.
-
Jan 2000
Oti 1 3rd floor, el, me, sp & ls.
-
Jun 2000
Oti-1 5/f el me ls sp 5/f.
-
Feb 2001
Tie backs and underpinning as a part of adj new construction proposal at 199 new montgomery st.
-
Jan 2002
Repair of natoma st sidewalk & sub-sidewalk structurl slab along building frontage, no increase in offi.
-
Nov 2002
Temporary shoring & underpinning for new construction.
-
Oct 2005
Suite 300 - partial demolition: 4 offices incl doors&walls.new low walls & partial full hight wall.electrical design build under separate permit. no mceh work all existing.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Apr 2019
Third floor tenant improvement: eliminate corridor new bathrooms, new lighting, new non-structural partitions, paint. new elevator panel upgrade, new entry (building) threshold. maher n/a.
-
Jul 2019
Ti - new restrooms, remodel offices & corridor; new server room, re-lamp existing lighting scheme using existing j-boxes; replace existing in-suite hvac as necessary; paint, repair & re-coat existing floor; paint throughout.
-
Jun 2020
Ti new toilets, new fixtures & new finishes, new lighting @ existing j boxes. sand & patch existing wood floor.
-
Nov 2020
Suite 300. tenant improvements incl new meeting room with new doors, change in lighting layout.
DBI holds 109 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 109. 7 of them are nominal $1 street-space or sidewalk permits.
The archive records two different addresses for this photograph, “608 Howard Street” and “606-612 Howard Street.” Not yet documented: the architect and builder and the early tenants. The 2008 survey of this district dates the building to 1907; the assessor dates the building on this parcel to 1904. Submit an update