182–198 Second Street
East Cut · San Francisco, CA 94105
-
1909
Built as the Knickerbocker Building.
-
Jul 1985
Repair & replace parts as needed -windows.
-
Dec 1986
Divide 2nd floor to 3 leasable spaces, errect 1-hr wall.
-
Oct 1987
Comply 104f, complete in stages.
-
Nov 1987
Tenant improvements @ 5th floor.
-
Apr 1998
Oti i - 3rd floor.
-
Mar 2000
Disabled access compliance for violations.
-
Apr 2000
Soft demolition of all partition walls, remove ceiling, lights & mechanical ducts within ceiling.
-
Apr 2000
Access & path of travel upgrades new ramp at ground floor.
-
Jun 2000
T/i demolition sink counter new partition walls new door & frame electric wrk under separate permit.
-
Jan 2001
Installation of one miracell antenna on the side of the building and place an equipment cabinet on the r.
-
Feb 2001
Limited upgrades to bsmnt toilet room on 5th floor toilet.
-
Apr 2001
Rev. to appl#200004248000 handrail & support modifcations.
-
Apr 2001
One-stop: m tjoe: attach 2 18" micro cell antenna on the se corner of the building. build 10x10' equipmen.
-
Jun 2001
Street space.
-
Jul 2001
Oti-1 4th floor, el.
-
Sep 2001
Street space.
-
May 2002
Akk existing electrical. panels/telecommunications boards and hvac controls located in existing exit stairway.
-
Jun 2002
Removal of non structual add locker multiple occupancy m/f locker room, accessible rest, yoga studio.
-
Jul 2002
Oti-1 3rd floor.
-
Mar 2003
Renew permit application 200205206938, also estimated cost of job in error at previous appl, rev. cost to $200, 000.
-
Apr 2004
Modify wireless telecommunications faciliti, add two radio equipment cabinets and replacement.
-
Mar 2005
Demolition existingwomen room lavs, counter &base cab&door.minor demolition portions of existingwall for new door openings.
-
Jun 2005
Demolition in mens & womens rm, 20% ada work, new non rated partitions in office space, new electrcal.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Apr 2014
T.i. including new commercial kitchen, food prep area, seating area, retail areas, electrical, mechanical and plmg work with new accessible bathrooms. n/a for the maher ordinance #155-13.
DBI holds 79 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 79. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update