108 Natoma Street
East Cut · San Francisco, CA 94105
-
1908
Built as the Byron Jackson Building.
-
Aug 1984
Interior partitions, insulation, modifications, heating.
-
Jun 1986
Removal of existing bank depository, new entrance doors.
-
Aug 1988
Add mezz lvl @ print shop, relocate door/renovate storefront.
-
Sep 1988
Replace partitions, 3rd floor only.
-
Oct 1988
Tenant improvement.
-
Nov 1988
Existing non-structural partitions to be removed.
-
Dec 1988
Heating & air conditioning on 1st, 2nd and 3rd floors.
-
Oct 1989
Insall awnings.
-
Dec 1998
Urm seismic upgrade and ada upgrade.
-
Apr 2001
Street space use.
-
Jan 2005
Prepare for instalation of new emergency generator, reinforce existing steel beam support and install new.
-
Jun 2006
Install fire panel & voice e-vac system in a basement and fire protection devices thruout the floors. monitoring per nfpa 72 remote sytem monitoring.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
May 2011
Remodel existing office lobby. remove existing exterior awnings, light fixtures & exposed conduit. new storefront & entry to ground floor retail space.
-
Jun 2011
Interior non structural demolition for floors 1-6. all work to comply with ab-17.
-
Aug 2011
Interior non structural remodel of floors 2-6 new partitions, finishes and lighting. fire alarm and mechanical work under seperate permit.
-
Sep 2011
2nd-6th floor: remove 2 existing sprinkler heads and relocate 2 existing heads type on floors 2-6. relocate existing 3" standpipe/hose cabinets with in new stair enclusure.
-
Sep 2011
Mechanical & electrical work associated with permit application 2011-0823-3070, includes title 24 compliance.
-
Nov 2011
Provide accessible restroom at unoccupied retail space. provide new gypboard throughout and storage.
-
Dec 2011
Demolition of partitions, doors, ceilings. non structural demolition only at 1st fl and basement. tenant improvement under sep permit.
-
Jan 2012
Interior non structural remodel on basement and ground floor areas.
-
Dec 2013
1st fl. t.i. renovation of existing office. new non-structural partitions, door, cabinets. plumbing & electrical under separate permit.
-
Feb 2019
1st-6th fl. 1st fl - demolition & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgrade.
-
Apr 2024
New observation deck at existing roof level.
-
Apr 2026
Exterior facade repair/maintenance: selective mortar re-pointing throughout.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update