132–142 Second Street
East Cut · San Francisco, CA 94105
Sullivanesque in style. The architect's other surviving San Francisco skyscraper is the Westinghouse Building at Second and Natoma Streets, designed in 1907 for Knickerbocker & Bostwick.
-
1907
Built as the Morton Cook Building.
-
Aug 1984
Upstrade oof roof disfram. parapet work on separate permit.
-
Aug 1984
Addition of anchors and braces to stabilize parapet.
-
Dec 1985
Rebuild existing toilets.
-
May 1995
Umb-comb anchors to be provided at 5th & 6th stories.
-
Jul 1996
Anchors along building perimeter @4thflr, crosswall extension.
-
Aug 1997
Umb-complete seismic work.
-
Jul 2000
Alter almost 1/2 of 1st floor; alter storefront.
-
Jan 2001
Install total 127 sprinkler heads in bsmt & first floor only. new system including underground.
-
Mar 2002
Construction phase modification to work underway per ap #9714964 /repair fire damage to two joists.
-
Jul 2003
Existing cafe will be refinished to a soup cafe.
-
Jun 2006
Fire damage repair - interior walls & ceiling gyp.bd. interior walls framing, nine windows, electrical & mechanical systems. all repair/replacement in like kind.
-
May 2007
Interior office demolition, no exterior modifications.
-
Jun 2007
Create new 2nd floor office, new walls, finishes and fixtures.
-
Nov 2007
Oti on ground and basement floors. upgrade lobby finishes. new storefront @ lobby and 2nd exit. new canopy at lobby and 2nd exit. new layout at basement storage. sprinkler, fire alarm, mechanical and lighting under separate permit.
-
Dec 2007
Basement - interior storage partitions (re-partition). ground floor - lobby interior upgrade (remove & replace finishes). no exterior changes. no structural. fire sprinkler, electrical, life-safety under separate permit.
-
Dec 2007
Replace existing building/tenant entry storefront. install new canopy. replace exit door at rear. new lighting and electrical for the building main entry lobby.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Feb 2008
4th floor: new interior partitions, new electrical, new lighting hvac under separate permit.
-
Apr 2008
5th fl tenant improvment. no structural. no exterior modifications. provide new partitions, finishes, lighting, kitchen, mechanical ductwork, revised entry door, 1 hr fr rear vestibule.
-
Dec 2009
Upgrade finsihes and fixtures at ground floor common restrooms. barrier removal.
-
Dec 2010
Interior tenant improvement; remove 2-walls, new break rm. area, paint & carpet. no electrical, plumbing or struct., or exteriors.
-
Apr 2013
Reroofing.
-
Sep 2021
Adding security gates to the 2 existing doorways on minna street.
-
Dec 2022
2/floor: ti improvement of existing shell office space, new interior non-structural partitions & finishes, lighting, millwork, & kitchen equipment, mep design to be submitted separately.
-
Jan 2023
At&t mobility installation of new unmanned telecommunications facility on rooftop. sffd operational permit for batteries on a separate permit.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update