149 2nd Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Bothin Real Estate Co. Building.
-
May 1993
Install accoustical ceiling.
-
Sep 1995
Reroofing.
-
Jun 1999
Erect a single faced non-electric wall sign.
-
Feb 2001
Seismic upgrade to existing 4 stories & basement building, new elevator & new stairs (replaced).
-
Sep 2003
Install underground & overhead n.f.p.a. 13&24 fire sprinkler system & wet stand pipe.
-
Dec 2003
Oti-1 4/f el me ls sp.
-
Dec 2003
Oti-1 2/f el me ls sp.
-
Dec 2003
Oti-1 3/f el me sp, ls.
-
Dec 2003
Oti-1 1/f el me ls sp.
-
Feb 2004
Replace existing double hung windows with new double glazed, double hung windows at 2nd, 3rd & 4th fl. rep.
-
Mar 2004
New fire alarm system: horn strobes & horns in public area. horn in non public area. elevator smoke.
-
Apr 2004
As builts showing relocation of bathrooms etc. & new drop ceiling. sprinkler pipes relocated & heads.
-
Apr 2004
Rev.to appl#200312081779 ground floor office lobby.
-
May 2004
Provide tiebacks per plan to shore building adjacent to new construction under app #9904253 and.
-
Jun 2004
T/i hvac work only for basement, 1-4 floors, base building. mep approved under #200102142156.
-
Jul 2004
New fire alarm system, horn strobes & horns in public areas, elevator smoke & shunt trip, fsd's & fan.
-
Jan 2005
Renovate existingvacant retail into osha thai restaurant @ g/f, mechanical, hvac under seperate permit.
-
Feb 2005
The existing building 1st floor alarm system shall have devices added to the space for ti. added & re.
-
Feb 2005
Installation of restaurant hood & ventilation system per app #200501143316.
-
Mar 2005
Renovate exist sprinkler sys to accumodate new restaurant.n.f.p.a 13 fire sys.reference 200502115329.
-
May 2005
Installed automatic fire suppression system for the cooking hood an duct using range guard ul-300.
-
May 2005
To erect electrical sign.
-
Apr 2016
Grnd floor: interior remodel of existing restaurant.
-
Jul 2016
Ground floor: relocate 14 sprinkler heads. add 6 upright sprinkler heads. ref app#201604053950. n/a for maher.
-
Sep 2016
Revision to app#201604053950. document dropped ceiling framing per inspector request. in lieu of metal studs per detail 1/ao1, use wood studs throughout per detail 8/s2. n/a for maher.
DBI holds 38 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 38. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update