165–171 2nd Street
East Cut · San Francisco, CA 94105
-
1912
Built as the Electrical Building.
-
Feb 1984
Renovation of the electric building.
-
Feb 1984
Demolition of interior, non structural partitions.
-
Oct 1984
Partial sprinkler system.
-
Oct 1989
Structural alteration as epr plan and spec.
-
Nov 1989
Alteration work under p.a. #8920424.
-
Aug 1990
Structural alteration per revised plan.
-
Feb 1994
Remodel whole space at the ground floor install new restau.
-
Mar 1994
Cti 1 5th floor el me.
-
Mar 1994
Cti 2 3rd floor el me.
-
Apr 1994
Cti-1 el me.
-
May 1995
Hvac t. i. work 2, 3, 4, & 5th floors.
-
Apr 1998
Furniture showrm with related electrical & plumbing, soffits &partitions.
-
Feb 2000
Consists entire non structural interior t/i for an office.
-
Jul 2000
U/g entry to be ada compliant and key access for evening entry. new paint and lights.
-
Aug 2009
Office ti on 6th fl, restroom upgrade, selective int.demolition and construction of partitions, doors, frames and finishes casework and minor rev. to electrical., plumbing, and minor rev. to life safety systemn. mep and life safety will be under separate permit.
-
Aug 2009
Project closes an opening in the structural slab to return space to the original condition upon lease expiration of a two floor tenant.
-
Apr 2010
5th floor suite 500 minor remodel to existing commercial (office) tenant space including partitions, door frames, electrical & mechanical improvements.
-
Sep 2015
'verizon wireless' - wireless is proposing a roof-top build-installing 8 antennas behind/inside 2 frp screens. there will be 2 gps antennas. there will be 15 rru-12 units with 15 a2 modules. 3 antennas will also be in faux radomes.
-
May 2016
Interior t.i. to an existing restaurant space. all exterior work under sep permits. sprinklers sep. permit.
-
Sep 2017
Tenant improvement on 3rd fl consisting of new non load bearing partitions. mechanical work to accomodate new office space; relocating a vav, adding new exhaust fan, installing new duct work to accommodate new conference, huddle, and phone room. electrical under separate permit.
-
Aug 2018
Comply with nov 201842221; repair damaged brick facade facing 2nd street.
-
Dec 2019
Improvement of lease hold space. cmo and new construction req. the work 8include new interior wall, door frames, finishes.
-
Feb 2022
Verizon wireless site modification removing & replacing 6existing antennas with 6new antennas; retaining 2(e0 antennas; removing & replacing 2existing 24" radomes with 2new radomes; removing & replacing 3existing rrus-32 b2 units with 3new radio 8843 units @ antennas; installing 3new radio 8863 units @antennas.
-
Dec 2025
Demolish existing old boiler. disconnect pipes, power and gas. install new boiler (model# rbi dw600, sn# 052599780, 475 lbs) same capacity, same size, and reconnect pipes, power and gas.
DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 3 of them are nominal $1 street-space or sidewalk permits.