575 Market Street
East Cut · San Francisco, CA 94105
-
1975
Built.
-
1975
The Standard Oil Building here was newly built, a forty-storey tower.
-
Feb 1982
Additions alterations or repairs.
-
Dec 1994
Horizontal.
-
Dec 1994
New partitions, electrical, mechanical, plumbing, finishes.
-
Oct 2002
Conversion the 19 floors from office use to residential use.
-
Feb 2012
12th floor suite 1200, elevator lobby, men's & women's restrooms, demolition & construction of non-structural partitions, ceiling, light fixtrues, door & diselights, plumbing fixtures, restroom accessories, & finishes. no change in occupancy or use, mep under sep permit.
-
May 2012
Retrofit of existing life safety system including the firefighter's override panel.
-
Jul 2012
Renovation for the ste 900, elevator, lobby and men's & women's restroom on the 9th floor. demolition & construction of non-structural partitions, ceilings, light fixuturs, door & side lights. plumbing fixtures, restroom accessories & finishes. no change in area, occupancy or use fire alarm, sprinkler.
-
Aug 2012
32nd floor-tenant improvement including new non rated partitions, glazing, millwork, plumbing, lighting, finishes & associated mechanical & electrical.
-
Feb 2013
Commercial ti to portion (5826 sq ft) of e 15th floor.
-
Jun 2013
Renovation of 6th floor. demolition & construction of non-structural partitions, doors, glazing, ceiling, light fixtures, hvac, millwork & finishes. restrms to be upgraded with new fixtures & finishes. no change in occupancy or use. f/a and sprinkler under separate permit.
-
Dec 2013
Installation of new 1-hr fire/smoke barrier with in existing mechanical room. replace existing chiller ch-1. upgrade of mechanical room ventillation. upgrade of ems system. new power feeds to new ch-1 and associated equipment.
-
Dec 2013
Demolition and construction of non structural partitions, doors, glazing, ceiling, light fixtures, hvac, millwork, finishes. restrooms to be updated with new fixtures and finishes. no change in occupancy or use.
-
Apr 2018
7th floor - ti - minor dem of finishes & non structural partitions. addition include non structural partitions, ceiling, light fixtures, ele, mechanical & finishes, new casework, new restrooms & finishes. def submittals: mep/fire/life safety. no exterior work maher na.
-
Apr 2018
4th floor - ti - minor demolition of finishes & non structural partitions. addition include non structural partitions, ceiling, light fixture, ele, mechanical & finishes, new casework, breakroom, ada improvements & new single user restroom. def submittals: mep/fire/life safety. no exterior work maher na.
-
Apr 2018
5th floor - ti - minor demolition of finishes & non structural partitions. addition include non structural partitions, ceiling, light fixtures, ele, mechanical & finishes, new casework, ada improvements and a single user restroom. def submittals: mep/fire/life safety. no exterior work maher na.
-
Jul 2018
Full floor office build out including new partitons, lighting, finishes and single user gender neutral bathroom maher not req.
-
Nov 2018
18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher.
-
Jul 2019
The project scope to renovate portions of the ground floor of the existing building & the exterior plaza.
-
Jan 2020
20th fl - new light & electrical work. no structural partrition new. no change in occupancy or use. ref pa 2019-1122-7959.
-
Sep 2020
23/f: non-structural demolition: new construction - warm sheel conditions with limited finishes construction. expansion of existing restrooms break room, new walls, new millwork.
-
Oct 2020
Suite 3000: ti work includes interior non-structural demolition, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/a.
-
Dec 2020
Ti on 28th floor, suite 2800: demolition & construction of non-structural paritions, glazing, ceilings, lighting, millwork & finishes. no change in occupancy, use or area. mep deferred.
-
Apr 2021
Replacement of 4 existing cooling towers at penthouse level. towers shall be replaced in situ and connected to existing mechanical, electrical & plumbing.
-
Apr 2022
Ste 1800 18th floor: t.i. demolition & buildout of non-load bearing partitions. modification to existing ceiling grid & tile. new light fixtures. new & salvaged office doors & frames. new millwork & finishes. structural work provided for operable partitions. mep, fire safety to be deferred.
-
Feb 2026
Interior ti for change of use from retail to cafe to include soft demolition to remove non structural partitions, construction of new interior partitions, restrooms, kitchen build out, mep, fire protection coordination, accessiblity upgrades, finishes per approved drawings. no change in occupancy.
DBI holds 995 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 995. 7 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 555 Market Street Same street
- 581–585 Market Street Same street
- 595 Market Street Same block
- 79 Stevenson Street Same block
- 71 Stevenson Street Same block
- 55 Stevenson Street Same block
- 25–27 Sutter Street Around the corner
- 55–57 Sutter Street Around the corner