37.7896, −122.4014 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0291, Lot 005B · ZIP 94104

Finance Building

576–580 Market Street

  • Office building
  • 6 stories
  • 35,162 ft2
  • 4,678 ft2 lot area
  • 4 residential units
  • 34 rooms
  • 12 bathrooms
  • Zoned C3O
  • Historic resource
  • Sold May 26, 2015
37.7896, −122.4014 Street View appears here once a Google Maps embed key is configured.
  1. 1923

    The Finance Building was built next to the Hobart Building, designed by Willis Polk to carry the Hobart's lower-floor decoration on to the east.

    National Register of Historic Places nomination (draft), California Office of Historic Preservation
  2. Nov 1982
    Permit 8209396 $$$ $26,000

    Building use: comml.

  3. Mar 1985
    Permit 8502246 $$$ $58,000

    Tenant improvements, partitions, electrical.

  4. Jan 1989
    Permit 8901530 $$$ $50,000

    New partition, electrica and plumbing.

  5. Mar 1999
    Permit 9905062 $$$ $36,000

    Demolition non-structural partitions/barier removal @ restrooms.

  6. Apr 1999
    Permit 9906663 $$$ $54,000

    Oti-1 3/f el.

  7. Oct 2002
    Permit 200210118826 $$$ $60,000

    C.t.i. remove fixtures, shelving. new const. of the storefront, finishes, fixtures, int. partition.

  8. Oct 2003
    Permit 200310066623 $$$ $120,000

    T.i for fast food restaurant. work includes new fixtures. equipment finishes new lighting & ductwork.

  9. Apr 2006
    Permit 200604209506 $$$ $84,000

    Interior demolition, relocate entyry doors, finishes.

  10. Apr 2006
    Permit 200604270080 $$$ $17,800

    Electrical only in lobby. architectural on separate permit.

  11. Aug 2012
    Permit 201208137207 $$$ $50,500

    Remove existing kitchen equipment. install new uni-sex accessible restroom. front door with automatic opening device at interior side. install new lighting, install new shelving and wood paneling at walls. relocate existing ductwork in new soffits.

  12. Sep 2013
    Permit 201309207402 $$$ $15,500

    Soft demolition. remove interior non load bearing partitons, suspended ceiling and flooring.

  13. Sep 2013
    Permit 201309207401 $$$ $12,500

    Soft demolition. remove interior non load bearing partitons, suspended ceiling and flooring per ab-017.

  14. Oct 2013
    Permit 201310119095 $$$ $230,000

    5th floor: t.i. interior drywall and glass partitions, millwork, lighting and floor finishes. electrical, life safty, plmg, under seperate permit.

  15. Oct 2013
    Permit 201310119094 $$$ $195,000

    2nd floor: t.i. interior drywall and glass partitions, millwork, lighting and floor finishes. electrical, life safty, plmg, under seperate permit.

  16. Dec 2013
    Permit 201312245002 $$$ $42,000

    5th floor t.i. mechanical, electrical, plumbing work.

  17. Dec 2013
    Permit 201312245003 $$$ $42,000

    2nd floor t.i. mechanical, electrical, plumbing work. building permit application 201310119095.

  18. Jan 2014
    Issued Permit 201401146231 $$$ $13,000

    Ground floor lobby - light demolition to soffit, benches & tile flooring, removal of wall paper, install mirrors to right wall upper, paint after wall repairs, polish existing concrete base floor.

  19. Mar 2014
    Issued Permit 201403070164 $$$ $6,800

    Add new fire alarm devices to existing fire alarm system in the new 2nd and 5th fl ti space. 1 new bps, 6 horn strobes, 8 strobes, 2 door holders, 4 pull stations. ref 201310119094, 201310119095, 201312245002, 201312245003.

  20. Sep 2015
    Permit 201509156945 $$$ $150,000

    Demolition interior walls, restroom, breakroom, t-bar ceiling and finishes. build 4 new offices, ada restrooms, breakroom and finishes.

  21. Dec 2015
    Permit 201512084429 $$$ $4,500

    6th floor: due to the interior remodeling for new tenant, new notification appliances and pull staitons will be install thru-out for complete coverage. new initiating devices will be tie-in to existing control unit. notification applinaces will be tie in to existing power supply. t.i. 201509156945.

  22. Apr 2017
    Permit 201704063339 $$$ $75,000

    Replacement of existing switch gear board with new. new concrete pad for new switch gear board. new wall and door for utility room. utility relocation/modification for new switch gear.

  23. Nov 2017
    Issued Permit 201711012868 $$$ $20,000

    G/f -t.i. of an existing floor tenant space for new cafe. to include new robotic cafe new order area, new prep room and equipment.

  24. October 1, 2026

    Rialto Takes Back 35,000 SQFT 580 Market St. Office After Paragon’s $17.5MM Debt Goes Unpaid — The Registry

DBI holds 48 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 48. 1 of them are nominal $1 street-space or sidewalk permits. 2 expired or cancelled permits are not shown.

Nearby