582–590 Market Street
East Cut · San Francisco, CA 94104
-
1922
Built.
-
August 21, 1934
Photographed, showing the Hobart Building.
-
1959
The Crown Zellerbach Building, completed 1959 to a Skidmore, Owings & Merrill design in the "Miesian" International Style, and designated City Landmark No. 183 in 1987 at the age of 28.
-
May 1964
Photographed, showing the Hobart Building.
-
Dec 1981
Additions alterations or repairs.
-
Feb 1986
Tenant improvement; renovation to 1st & 2nd floor.
-
Jan 1990
Move and expand teller line, new counter tops.
-
Aug 1992
T.i.-toilet upgrade to current h/c codes.
-
Nov 1992
Add sliding door.
-
Mar 1993
Cti-1 fl 02 el me sp.
-
May 1993
Cti 3 3rd floor (el sp).
-
May 1993
Remodel port building ext/4 column bays/remove existingglass/storefrt.
-
Sep 1997
T/i per plans provide walls new ceiling & new finish.
-
May 2001
Oti-1 gr fl el, me, ls.
-
May 2007
Install window washing equipment, davits, socket & anchors on the roof (levels 13 and 21).
-
Aug 2008
3rd and 4th floor: replacement of existing deteriorating plumbing risers and plumbing fixtures. deletion of floor urinal to accommodate new plumbing chase. deletion of existing janitor's sink to accommodate new risers.
-
Sep 2009
Revised & added davit-pedestal attachment to structure. revision to appl. #2007/0530/2500.
-
Jul 2012
Interior t.i for exist. bank. work includes new flring, new furniture, new teller counter, new partitions, new light cove, relocation of atm machines.
-
Sep 2012
Interior ti for e bank on ground fl. work includes new partitions, fixtures, finishes, relocation of int atm machines. no exterior work. mep and fire under separate permit.
-
Mar 2015
Replacement of plumbing line risers & new fire sprinkler riser test riser and plumbing and fire sprinkler riser test riser, floors 5-12. imcludes new plumbing fixtures, tile, paint and other upgrades.
-
Sep 2016
Shell improvement only. new wood entery door with sidelite. new wall to create elevator lobby. new radiator casework. n drop ceiling. furring frame at all e conc columns. box frame to conceal plumbing pipes. new lighting fixtures. new carpet tiles and solid surface countertop.
-
Dec 2016
Floors 13-20: replacement of failing plumbing risers & new fire sprinkler test drains and new plumbing for fixtures/restrooms tile and paint on each floor andmisc. accessibility upgrades.
-
Mar 2017
Window replacement only. exterior window replacement in the renovated restrooms in 3rd thru 12th floors. ref permit application 2015/03/27/2142.
-
Dec 2017
Fire alarm - voluntary replacement of fire alarm system to current code, class a not required. 705 fire alarm devices. elevator modernization and future fire alarm ti under separate permit(s).
-
Apr 2018
Existing flagpole replacement at penthouse deck/terrace level.
-
Feb 2019
Installation of emergency responder radio coverage system.
-
Jul 2019
Install an (errcs) emergency radio responder coverage system in building.
-
Oct 2019
Elevator modernization. 13th fl elevator machine room demolished & reconstructed to align to 13th fl. new machine room walls and doors. new elevator equipment & controls.
-
Mar 2023
Ffe demolition- wall repairs, act repairs, terminate electrical whips, paint & carpet.
DBI holds 74 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 74. 3 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 581–585 Market Street Same street
- 595 Market Street Same street
- 44 Montgomery Street Same block
- 55–57 Sutter Street Same block
- 25–27 Sutter Street Same block
- 540–548 Market Street Same block
- 1 Montgomery Street Around the corner
- 111 Sutter Street Around the corner