37.7899, −122.4025 A locator map appears here once a Mapbox token is configured.
Know This Place

District 3 · Block 0292, Lot 001 · ZIP 94104

Hunter-Dulin Building

111 Sutter Street · Financial District

  • 24 stories
  • 286,182 ft2
  • 16,000 ft2 lot area
  • 456 rooms
  • Zoned C3O
  • Historic resource
  • Individually listed on the National Register
  • Sold February 8, 2019
Land$151,933,697
Improvements$101,289,131
Total assessed$253,222,828
Photo of Hunter-Dulin Building
“Hunter-Dulin building detail from One Montgomery, San Francisco” by The wub, cropped, CC BY-SA 4.0, via Wikimedia Commons
  1. 1861

    The three-storey brick Lick House hotel was begun on the site, entered from Montgomery Street with shops along the rest of the ground floor and a bridge over Lick Alley at the second and third floors. It was reckoned San Francisco's first great luxury hotel. James Lick had bought the whole west side of the block on Montgomery and most of the Sutter Street frontage before this.

    National Register of Historic Places nomination, National Park Service
  2. 1876

    James Lick, who had built the hotel on this site and lived in it, died there.

    National Register of Historic Places nomination, National Park Service
  3. 1926

    Assessor’s “built” date. Built by Lindgren & Swinerton, Inc..

  4. 1926

    Its lifts were supplied by the Otis Elevator Company and assembled at the company's plant at 1 Beach Street.

    National Register of Historic Places nomination, National Park Service
  5. April 20, 1926

    The building permit was applied for on 20 April and issued two days later.

    National Register of Historic Places nomination, National Park Service
  6. May 1926

    Five thousand cubic yards of concrete went into the foundations in five stages, the last 1,500 poured continuously over forty-four hours — reported at the time as an unusual engineering feat, with footings and ribs five feet by eight.

    National Register of Historic Places nomination, National Park Service
  7. circa 1927

    Photographed, showing the Hunter-Dulin Building.

  8. 1927

    A French Renaissance Revival office tower of twenty-four storeys over two basements, clad in buff Granitex terra cotta on Sutter and Montgomery and grey coated brick behind, under a multi-faceted mansard of brown glazed terra cotta tiles with a pierced copper parapet and finials. Schultze & Weaver of New York designed it, H. J. Brunnier engineered it, Lindgren & Swinerton built it, and Gladding, McBean supplied 1,588 tons of terra cotta. The cost was reported at $3,500,000.

    National Register of Historic Places nomination, National Park Service
  9. 1927

    The National Broadcasting Company took the twenty-second floor, half the twenty-first and the Sutter Street offices on the third; every local operation including its radio broadcasts came out of the building until about 1942, when it moved to a purpose-built home at Taylor and O'Farrell Streets. Insurance companies and stockbrokers filled much of the rest, with the ground-floor corners let to a bank and to brokers, and a cigar store beside the entrance.

    National Register of Historic Places nomination, National Park Service
  10. March 1, 1928

    Photographed, showing the Hunter-Dulin Building.

  11. 1932

    Unspecified minor alterations were made over 1930 to 1932 under the supervising architect Earl T. Heitschmidt, recorded only in augmented specifications from the original project rather than in a permit.

    National Register of Historic Places nomination, National Park Service
  12. September 23, 1940

    The Federal Bureau of Investigation's main office was on the seventeenth floor, and took a room at the back of the ninth to hold and question a suspected kidnapper.

    National Register of Historic Places nomination, National Park Service
  13. July 5, 1964

    Photographed, showing the Hunter-Dulin Building.

  14. 1979

    The Foundation for San Francisco's Architectural Heritage rated the Hunter-Dulin Building "A" in the 1979 downtown survey it published as Splendid Survivors — the top of its four grades, which it reserved for the buildings it judged individually most important downtown. The Department of City Planning's 1976 Architectural Inventory rated it "5" on a scale running from 0 to 5. Buildings rated A or B by the Foundation, or 3 or above by the city survey, went onto the List of Architecturally and/or Historically Significant Buildings in the Downtown, adopted by the City Planning Commission on 29 May 1980 in Resolution No. 8600.

    222 Kearny Street DEIR, SF Dept. of City Planning, 1983
  15. Jul 1981
    Filing Permit 8106540 $$$ $6,000

    Additions alterations or repairs.

  16. April 17, 1997

    Listed on the National Register of Historic Places, as a focal point of the financial district and the only San Francisco building by its architects — the one where their mansard-roofed manner, carried on afterwards through a run of New York hotels, began. Dashiell Hammett gave Sam Spade an office here.

    National Register of Historic Places nomination, National Park Service
  17. Jun 1998
    Issued Permit 9810700 $$$ $1,500,000

    Newelec switchgear & bus duct riser new2nd means of egress.

  18. Jan 2000
    Issued Permit 9912724S $$$ $10,000,000

    Add alterations to permit 9810700 & 911472 (seismic upgrades of whole building).

  19. Dec 2000
    Withdrawn Permit 200012268625 $$$ $1,000,000

    Building upgrade architecutral electrical havac sprinklers, life safety will follow in separate appl.

  20. Feb 2001
    Issued Permit M15552 $$$ $1,000,000

    Street space permit.

  21. Dec 2013
    Permit 201312023137 $$$ $2,135,000

    Tenant improvement on 10th floor to build new non-load bearing partitions, ceilings, doors, frames, finishes and mep. all life safety and fire sprinklers on seperate permit.

  22. May 2014
    Permit 201405145738 $$$ $899,028

    T.i. includes the demolition of non-structural partitions & building new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety. work will be design-build and submitted seperately. building fully sprinklered.

  23. Oct 2015
    Permit 201510210363 $$$ $2,096,000

    New non-structural partitions, moified gyp bd ceilings and soffits, and new finishes throughout. note: mep, fire srpinkler, life-safety, and evac signage on deferred permits.

  24. Aug 2017
    Permit 201708104455 $$$ $850,000

    Project consist of a ti on the 17th fl of a 22 story building. build out includes construction of new non-load bearing partitions, glazing, ceiling, power and data, millwork, new finishes. mep, life saty, and sprinkler system under separate permit. maher na.

  25. Sep 2017
    Permit 201709158490 $$$ $650,000

    18th fl - ti includes demolition, new partitions, finishes & lighting. mep under separate permit.

  26. Nov 2017
    Permit 201711083458 $$$ $977,340

    Tenant improvemen on the 6th fl of 22 story building. consist of demolition of interior partitions, doors, finishes, ceiling, lighting, mechanical, and constructtion of new wall and glazing configuration, ceiling and lighting, power/datawork millwork and new finishes. mep electrical sep permit and ls sprinklers.

  27. Apr 2019

    Ste 700 - demolition & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defered permits.

  28. Aug 2019
    Permit 201908057898 $$$ $600,000

    #1200- ti- demolition int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permit.

  29. Aug 2019
    Permit 201908057899 $$$ $600,000

    #1300- ti- demolition int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permit.

  30. Sep 2019
    Issued Permit 201909252682 $$$ $1,500,000

    Historic facade repair & maintenance req'd to maintain/restore stable & water tight conditions of building enclosure, with intention of preserving the historic fabric of the building facades.

  31. Oct 2019
    Permit 201910174757 $$$ $1,200,000

    6/f, 12/f, 13/f: title 24 compliance, mechanical & electrical improvements. ref t.i. pa201908057897, 201908057898, 201908057899. maher n/a.

  32. Jul 2021
    Permit 202107214827 $$$ $550,000

    Floors 5/8/9: t.i. resrooms: removal of finsihes, light fixtures & restrooms, fixtures & accessories. maher n/a.

  33. Jan 2022
    Permit 202201246490 $$$ $591,132

    10/f: non structural demolition a construction of non structural partitions, doors, sidelights, ceilings, power, finishes a millwork.

  34. Aug 2022
    Permit 202208049891 $$$ $800,000

    4/f: demolition/construction of nonload bearing partitions, new office doors, ceiling lighting & new millwork/finishes & restroom upgradesc.

  35. Sep 2024
    Permit 202409130767 $$$ $950,000

    Interior tenant improvement; selective demolition and construction of non-load bearing partitions, new office doors, ceilings, lighting, and new millwork and finishes. mep and fire/life safety under separate permit.

DBI holds 480 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 480. 6 of them are nominal $1 street-space or sidewalk permits. 5 expired or cancelled permits are not shown. The assessor's roll gives 1926, the year the permit was issued; the nomination puts completion in March or April 1927.

Nearby