100–124 Montgomery Street
Financial District · San Francisco, CA 94104
-
1955
Built.
-
1955
The Moderne Equitable Life Building, designed by architect Wilbur Peugh.
-
1955
Wilbur D. Peugh's high-rise here went up about twenty-five years after his six-storey building next door at 130 Montgomery Street, and was clad in zigzag-patterned pressed metal panels meant to tie the two together.
-
Jan 1982
Additions alterations or repairs.
-
Jun 1982
Additions alterations or repairs.
-
Mar 2006
Oti-1, 8th floor, el, me, ls, sp.
-
Oct 2006
Reinforce existing, failing marble cladding & encapsulate it in a new cladding system. replace original roof and add exterior(window washing) mantenance system. repair and/or restore facades metal panels, mullions and exposed concrete/plaster replace storefront glass on ground level. new cladding.
-
Nov 2007
Provide new lobby & entrance to existing building, including demolition to existing mezzanine. all new finishes, including partitions, mechanical, electrical, plumbing, fire protection and fire alarm. new ada compliant entrance.
-
Oct 2008
3098 sq ft t. i. bank branch build out in vacant space, electrical and minor plumbing work to occur as well as architectural finishes at ground floor.
-
Nov 2008
Tenant improvement bank build out in vacant space (3, 098 sq ft) - electrical, mechanical & minor plumbing work to occur as well as architectural finishes; build out of atm vestibule on montgomery st.
-
Jan 2009
6th floor interior renovation of an existing open office space, architectural & electrical included in the permit, mechanical, plumbing & life safety under separate permit.
-
Apr 2014
1st floor, basement & mezzanine - mechanical & electrical drawings for tenant improvement permit application 2014.0207.8116. shall provide approved drawings for shaft.compliance with ord 155-13 not required.
-
Oct 2014
11th floor: interior non structural tenant improvements in an existing unoccupied office tenant suite. scope includes new office spaces with paritions, doors, open and finished ceiling and finishes. deferred submittals, design build mep, life safety, spriklers.
-
Oct 2014
12th floor - construction of new open office work & collaborative spaces, coffee & small meeting rooms. defferred submittals include mep, life safety & sprinklers. all design build. n/a for maher ordinance.
-
May 2015
25th floor: non structural interior construction in existing vacant space. no change to use. mep/fire/life saftey under sep permit. maher na.
-
Jun 2015
23rd floor: non structural interior construction in existing vacant space. n/a for maher.
-
Oct 2015
19th floor: non-structural interior construction in existing vacant space.
-
Mar 2016
Tenant improvement 10th fl of a 25 story building. buildout consists of new interior partitions with glazing configuration, ceiling, power/data workk finishes. life safety, mechanical plumb, sprinkler mods under seperate permit.
-
Jul 2016
4/f - arch set non-structural interior construction in existing suite. n/a ordinance #155-13 mep and fire deferred submittals.
-
Nov 2016
1st floor lobby remodel: selective demolition of millwork and finishes. new construction at interior consists of millwork. doors, fixtures, hardware and finishes. exterior work consists of a marquee at bld entrance, electrical under sep permit maher na.
-
Mar 2017
20th floor, ste 2075 - non-structural interior construction in existing vacant suite. ada upgrades to existing women's & men's restroom to full compliance. n/a ordinance #155-13.
-
Mar 2019
5th floor: non structural interior construction in existing vacant suite. ada upgrades to existing mom's & wones restroom to full compliance. mep & fire sprinkler by design build constractor under separate permit. maher na.
-
Sep 2019
Demolition of non-structural storefront and addition of storefront of retail ground level. installation of demising walls.
-
Jan 2020
15th floor: non structural interior construction in existing vacant suite. ada upgrade to existing men's and women's by design build contractors.
-
May 2020
18th floor. non-structural interior alteration in existing vacant suite. ada upgrades to existing men and women's restrooms to full compliance. mep and fire sprinkler by design-build contractor.
-
Jan 2021
Tenant improvement: a 650 sq ft addition to an existing tenant space on the ground levelat 88 sutter street. work includes light gauge framing, new interior hvac ductwork and exhaust systems, interior electrical systems, interior finishes and interior furnishings. interior work only.
-
Jul 2022
Suite# 1800: non-structural interior construction and installation of newfinishes in existing vacant suite. mechanical, electrical, plumbing and fire sprinkler modification by design build contractor.
-
Aug 2022
13th floor - non structural interior construction and installation of new finishes in existing vacant suite, const. of interior walls partitions, rcp ligting fixtueres, electrical and mechanical fixtures, millwork, window bunds.
DBI holds 852 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 852. 15 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 44 Montgomery Street Same street
- 101–145 Montgomery Street Same street
- 130 Montgomery Street Same block
- 180 Montgomery Street Same block
- 225 Bush Street Same block
- 1 Sansome Street Same block
- 108–110 Sutter Street Around the corner
- 126 Sutter Street Around the corner