225 Bush Street
Financial District · San Francisco, CA 94104
-
Apr 1982
Additions alterations or repairs.
-
May 1985
Construct new entrance and renovate 1st floor lobby.
-
Feb 1993
Seismic upgrade.
-
Nov 1999
22nd floor & roof-renovation of existing office space.
-
Apr 2000
Work related to hvac system.new water chiller, piping, heat ex.
-
Jul 2001
Interior renovation on g/f & mezz floor install a new elevator to provide access to mezz floor.
-
Jan 2008
Maintenance & repair to exterior brick and terra cotta walls and lay tile roofs. replacement of exterior sealant joints and broken tiles at each 20th floor balcony deck.
-
Apr 2010
20th. & 21st. floors. tenant improv. includes demolition of non-structural partitions & building. new structural partitions. all new or revised hvac, electrical, plumbing & life safety work will be design & submitted for permit separately. building. is fully sprinklered.
-
2013
Offices of the Bay Area Reporter, suite 1700, from 2013 to 2014.
-
Jan 2013
14th floor-interior tenant improvement-new non load bearing walls, finishes. new lighting, mechanical, electrical, plumbing. m.e.p under seperate permits. no structural work. restroom work.
-
Jan 2013
15th floor-ti office space-new lighting, finishes, non load bearing walls. no change of use. upgrade restrooms. m.e.p under seperate permit. t-24 calcu under seperate permit. mechanical. under seperate permit and not included in vaulation of this permit. sprinkler & fire alarm under seperat permit.
-
Feb 2013
Approx 26000 sq ft ti improvement on 10th fl. improvements include addition of offices, meeting rooms, break area, pantries & unisex restroom. finish upgrades include floor, wall & ceilings. mep & fls inc sprinkler under sep permit. no structural work.
-
May 2013
6th floor: interior t.i. consisting of new partitions, glazing doors ceilings. mep, life safty and fire sprinklers under seperate permit.
-
Oct 2013
Interior t.i improvement on the 13th fl to include new breakroom & office etc. new ada compliant restroom core is addded in addition to existing ada compliant restrooms to remain.
-
May 2014
16th floor: non structural demolition, new non-structural partitions, ceiling and lighting, electrical, mechanical, millwork, and finishes. no change in occupancy or use. sprinklers, fire alarm and duct detector separate permit permits.
-
Jun 2014
Interior non structural ti on 5th floor. new partitions, power, lighting hvac. demolition pa done under 201403170923. sprinkler and fire alarm under separate permit.
-
Sep 2014
Archtiectural work is limited to minor demolition and repair/replacement of non-original finishes, new mep & accessible restrooms on 1/f & 2/f. sprinklers & fire alarm under separate permits.
-
Jan 2015
9th floor tenant interior improvement consisting of new partitions, glazing doors ceilings lighting and electrical fixures. no structural. no exterior work. mep deferred submittal.
-
Jan 2015
8th floor t.i. for office work includes new partitions, glazing, doors ceilings, lighting, fixtures, finishes. no structural work. mep, fire protection under separate permits.
-
Apr 2015
17th floor: t.i. to demolition and construct non-structural partition, doors/frames, hardwar, millwork, ceiling, finishes, mechanical, electrical and plumbing. f/a, sprinkler under separate permit.
-
Dec 2016
16th floor: t.i. to install new partitions, miillwork doors, and finishes. upgrade restrooms to ada compliance and new mep. fire sprinkler and alarms on seperate permit.
-
Feb 2018
Arch/mechanical ti on 2nd floor non-structural demolition, new non-structral partitions, doors, electrical, finishes, millwork. no change in occupancy, use or area. electrical, plumbing, life safety under sep. permit. smoke detectors for fans >2000 cfmto be provided.
-
Jun 2018
2nd floor - non-struct demolition, new non-struct partition, ceilings, lighting, finishes, toilet and shower rooms, no change in occupancy-use-area. life safety and sprinklers separate permit.
-
Dec 2018
Ti on 15th fl: demolition & construction of new non-load bearing partitions, doors, millwork, glazing, finishes, & mep systems. life safety & fire alarms.
-
Mar 2019
14th fl - partial floor ti to include selective demolition, new partitions, ceiling finishes. mep, life safety & sprinkler under separate permit.
-
Jun 2019
17th fl ti work includes non structural partitions, doors, millwork, ceiling, flooring, and associated mep work.
DBI holds 715 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 715. 14 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update