180 Montgomery Street
Financial District · San Francisco, CA 94104
-
1978
Built.
-
1979
Designed by Corwin L. Booth.
-
Feb 1982
Additions alterations or repairs.
-
Dec 2005
Oti-1 1/f ls, me, ls, sp.new entry vestibule, concrete ramp, stone flooring, carpet, paint, new teller cabinetry, wood paneling & ceiling, new light fixtures, new sink & faucets, relocate fire sprinkler heads, glass guardrails, relocate supply air grilles.
-
Dec 2007
Interior office tenant improvement on groud floor lobby. work includes new wall, floor and ceiling finishes, new lighting and electrical. work and relocation of hvac supply grilles. relocation of sprinkler heads under separate permit. no exterior work.
-
Jan 2008
G/f lobby- revision to permit application 200712170615: addition of exterior canopy, arcade ceiling painting, new lighting & signage. replacement of column wraps, new flooring in arcade and demolition of existing tenants signage. all new work as indicated in clouding of 3.
-
Apr 2008
17th floor: non-structural interior demolition of drywall partitions, ceiling, finishes, cabientry, & miscellaneous ductwork, new work consists of new drywall partitions, acoustic ceilings, doors, cabinetry, & finishes.
-
Feb 2012
22nd floor: includes demolition and construction of non load bearing walls, and interior framed glazing, relocation of existing light fixtures, new suspended ceiling, new millwork and new finishes. mep under seperate permit. fire sprinkler and life safety, alarm work under separte permit.
-
Feb 2012
9th floor: includes demolition and construction of non load bearing walls, and interior framed glazing, relocation of existing light fixtures, new suspended ceiling, new millwork and new finishes. mep under seperate permit. fire sprinkler and life safety, alarm work under separte permit.
-
Jun 2012
3rd floor - demoliton and constrcution of non-load bearing walls and interior glazing, new lighting, new suspended ceiling, new millwork and finishes. fire sprinkler and life safety alarm work under separate permit. mechanical and electrical work under separate permit.
-
Jun 2012
2nd floor - demoltion and construction of non-load bearing walls and interior glazing, new lighting, new suspended ceiling, new millwork and finishes. fire sprinkler, life safety alarm work, mechanical and electrical design work under separate permit.
-
Mar 2013
8th floor - demolition/construction of non-load bearing interior partitions & interior framed glazing, new light fixtures, ceiling, millwork & finishes. mep, life safety & sprinklers under separate permit.
-
Mar 2015
Remodel of bank of interior: non-bearing walls, cabinetry, electrical, ceiling, hvac and finishes: 5432 s.f. sprinklers and fire alarm separate permit.
-
Aug 2015
20th floor; ste 2000: construction of new non-load bearing partitions, new ceiling grid & tile, new light fixtures including switching, new office doors & frame, new millwork, new sink & new finishes. mep & electrical under separate permit.
-
Feb 2018
This project involves modification of an existing t.i. to include demolition construction of non-load bearing partitions, relocating light fixtures, new doors and frames, new millwork and new finishes. mep, sprinklers and fire alarm separte permits.n/a for maher.
-
Jan 2019
Ti suite 300 - to include demolition, new partitions, new ceiling and finishes. mep/fire/life safety under sep permit.
-
Apr 2019
13th fl - ti including demolition and construction of non-structural partitions, new lighting, new finishes. scope includes elevator lobby.
-
Apr 2022
Ste #1950: work include selective demolition and construction of non-load bearing partitions. modification to ceiling grid and tile, light fixture relocation and new/re-switching, new office doors and frames and new finishes.
-
Jun 2022
Suite 1250 on 12th fl: work include: selective demolition and construction of non bearing partitions existing modification of ceiling grid and tile life fixture. mep deferred.
-
Mar 2023
23rd fl, ste 2340 - 1742 sq ft interior tenant finish for dental office ti. fully sprinklered.
-
Nov 2023
13/f: new office ti to include new non-structural partitions, ceilings, finishes, and associated mep work. ref demolition permit 202310108327.
-
Nov 2023
22nd/fl: office t.i. to included new non structural paritions, ceilings, finishes, & mep. demolition permit: 202310108328.
-
Dec 2023
25/f: ti constructing non structural partitions, ceilings, finishes and associated mep.
-
Dec 2023
24/f: ti constructing non structural partitions, ceilings, finishes and associated mep.
-
Apr 2025
Suite 2300: selective demolition and construction of non load bearing partitions, modifications to ceiling grid to tile, light fixtures, new office doors, frames and new finishes (mep deferred).
-
Aug 2025
2/f -t.i. of existing full floor suite on the 2nd floor. demolition of non-structural partitions. new non-structural partitions doors, ceilings, millwork, finishes, m.e.p., and light fixtures.
-
Sep 2025
21/fl- suite 2100- interior ti to include new ceiling, partitions, lighting and mep upgrades.
DBI holds 746 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 746. 6 of them are nominal $1 street-space or sidewalk permits. This building's context statement dates the work 1979; the assessor's roll records the parcel as built 1978.
Nearby
- 149–155 Montgomery Street Same street
- 200–232 Montgomery Street Same street
- 130 Montgomery Street Same block
- 100–124 Montgomery Street Same block
- 225 Bush Street Same block
- 1 Sansome Street Same block
- 220 Bush Street Around the corner
- 108–110 Sutter Street Around the corner