108–110 Sutter Street
Financial District · San Francisco, CA 94108
-
1902
The Bullock & Jones Building of 1902, by Hemenway and Miller, later remodelled as the French Bank Building.
-
1906
Built.
-
1979
The Foundation for San Francisco's Architectural Heritage rated the French Bank Building "A" in the 1979 downtown survey it published as Splendid Survivors — the top of its four grades, which it reserved for the buildings it judged individually most important downtown. The Department of City Planning's 1976 Architectural Inventory coded it 3-D7-4.
-
October 6, 1982
The French Bank Building was named as one of six buildings in the Hallidie Building Block - Retail Historic District, which the Landmarks Preservation Advisory Board recommended to the City Planning Commission for designation as a city historic district. The district was centred on the Hallidie Building at 130 Sutter Street and covered that side of the block; it also lay within the larger Retail-Shopping Historic District that Heritage had identified as eligible for the National Register.
-
Feb 1983
Remodel three existing bathrooms.
-
Oct 1983
Additions alterations or repairs.
-
Dec 1991
Non structural partitions revision.
-
Sep 2000
Oti-1 10th floor, el, ls.
-
Sep 2000
Oti-1 9th floor el.
-
Feb 2001
Oti-1 10th floor el, me, l/s sp.
-
Feb 2001
Oti-1 (rev) 9th floor, el, me, l/s & sp.
-
Apr 2002
Remodel of 3rd fl for medical office space.
-
Sep 2004
Oti-1 9th floor el, me, l/s.
-
Jan 2006
Oti-1 7th floor, el, ls. new men & women restroom, enclosing 2 fire exit stairs.
-
Mar 2006
Tenant imporvemtns on ground floor retail/offie space. electrical & plubing, mechanical under separte permit.
-
Jun 2006
Oti-1, 7th floor, el, ls.
-
Sep 2007
6th floor-enclose existing interior stairs with 1hr-fire rated construction; new fire-rated elevator lobby; new accessible restrooms. mechanical. electrical. and plumbing under separate permit. no exterior work.
-
Oct 2007
Tenant improvement on the vacant 6th floor. new partitions, ceilings, lighting, mechanical and electrical work.
-
Jun 2011
Barrior removal project demolition of existing plumbing fixtures light fixtures, ceiling grid, partitions, doors/frames/hardware and finishes on 2nd and 4th floor men's restrooms. constrution of new partitions, door/frames, gyp ceiling, light fixtures, plumbing fixtures and finishes.
-
Aug 2011
Floor 3rd - demolition of existing plumbing fixtures, light fixtures, ceiling grid, partitions, doors/frames/hardware & finiahes. new const women's & men's restroomsincluding partitions, doors/frames, gyp ceiling, light fixtures, plumbing fixtures & finishes. new light fixtures, me & sprinkler under separat.
-
Nov 2013
Demolition of some existing walls (non-structural) new framing of dental office, new plumbing, new electrical & new interior finishes cabinetry etc.
-
Oct 2017
2nd floor #200 - amep remodel of ~1300 sq ft tenant space work includes new partitions, susp ceiling, lighting, electrical, plumbing, casework & finsihes. fire under separate permit(s).
-
May 2018
Remodel of existing 5th fl: for use by single tenant. work includes interior partitions, susp. ceiling, lighting, electrical, plmg, casework and finishes. work includes one new toilet room. mep, title 24 and life safety to be permitted seperately.
-
Jun 2018
Interior remodel at 10th floor tenant space. work includes new partitions, doors. lighting, electrical and accessibility upgrade restroom. mep and life safety permitted separately.
-
Jul 2018
5/f - suite 500: t.i.: install vrf system for floor. new ducted fan coils, duct work. ref permit application 201805240048.
-
Aug 2018
6th fl - full floor a/mep renovation of interior 6th fl tenant space. new restrooms and doctor's office. file ab005/ab037 for 1-hr corridors and 20 min doors to meet exit separation requirements. unsprinklered building. fire alarm under separate permit.
-
Nov 2020
Facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of existing windows and existing guardrails. maher n/a.
-
Aug 2021
Sw corner stuctural repairs. ref facade repair & maintenance permit application 202011168984. install new verical supports for existing stone with ss anchorage & plaets to existing steel columng. patch holes to match existing characteristics & color of existing stone.
-
Oct 2025
Interior remodel @ 5th fl tenant space includes demolition, new partitions, doors, lighting and electrical and plumbing. any mep, title 24 energy calcs, and life safety work to be permitted separately.
DBI holds 126 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 126. 4 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 55–57 Sutter Street Same street
- 111 Sutter Street Same street
- 126 Sutter Street Same block
- 130–150 Sutter Street Same block
- 105 Montgomery Street Same block
- 101–145 Montgomery Street Same block
- 100–124 Montgomery Street Around the corner
- 130 Montgomery Street Around the corner