44 Montgomery Street
Financial District · San Francisco, CA 94104
Permit history
-
Dec 1981
Additions alterations or repairs.
-
Oct 1989
Total asbestos removal from steel structure.
-
Nov 2005
39th floor - enlarge existing computer room & enhance both mechanical & electrical systems infrastructure to support current & future operational requirements of the computer room.
-
Aug 2011
28th fl: ti includes demolition of non partitions and building new non structural partitions. all new revised hvac, electrical, plumb, life safety. work engineered and included within permit submittal except life safety and sprinkler work.
-
Feb 2012
26th floor: t.i. includes demolishing of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plumbing work is engineering and including within this permit. building is fully sprinklered.
-
Jul 2012
27th floor t.i. - demolishing of non-structural partitions & building new non-structural prtitions. all new or revised hvac, electrical, plumbing included in this permit. life safety, sprinklers if needed under separate permit. fully sprinklered building. infill old stair/floor area. high density file.
-
Apr 2015
39th floor: non-structural ti - partitions, doors, interior glazing, electrical, plumb, cabinetry and finishes. maher not 0req'd. ref permit application 201504093269.
-
Feb 2016
Ti work on 18th floor of existing 43 story high rise blgd. this includes change of use from office to adult education (post-secondary education). maher na.
-
Aug 2017
22/f- t.i. full floor to include walls, ceiling, furniture & finishes installation. mechanical. & electrical. and fire under seperate permit. n/a ordinance #155-13.
-
Aug 2017
Interior improvement including walls, ceiling/lights, furniture and finishes. mechanical & electrical under a separate permit.
-
Sep 2017
33rd fl/suite 3300 partial remodel of 33rd fl includes new non load bearing walls, ceilings, doors, finishes, furnishinggs. mep, ls, sprinklers under sep permit.
-
Oct 2017
2nd fl full floor ti: installation of new non-bearing partitions, gyp bd ceilings, millwork, countertops, fxitures, paint & floor covering througout; card readers at elevator lobby and other locations. mechanical, electrical, plumbing, fire/life safety, 2-way comm under seperate permit. maher na.
-
Oct 2018
Minor upgrades to exterior of the building on the montgomery street side only. new unifying band with coved uplights at the arcade. new downlights for the canopies/arcade. signage scope under separate signage permit. electrical plans under separate permit. **maher n/a**.
-
Oct 2018
3rd & 4th floors - repositioning of existing roof deck from tenana ameminty to bld amenity including new planter, new fixtures throughpout, new paritions, handrail and guardrail, ada access, egress, and additional access includes new vertical platform lifts. fire/life/safety, plumb/ele under sep permit.
-
Nov 2018
41st floor - ti of full floor ti suite currently an empty shell. mep included. life safety and sprinklers under sep permit maher na.
-
Aug 2019
24th floor - ti to existing ofc space. demolition existing non load bearing partitions, wall finishes, ceiling and associated mep & av equipment construction of new non load bearing partitions, ceiling & fixtures.
-
Oct 2019
39/f: t.i. to existing office.demolition of existing non-load bearing partiions, walls, finishes, celings and oassociated mep. a/v equipment, construction of new non-load bearing partitions, celing & finishes. mahern /a.
-
Jul 2020
Suite 2000: project consists of demolition of existing partitions & associated power/data, floor finishes, & lighting. construction of full floor tenant suite to include nw partitions, doors, power, lighting, millwork & finishes. all work to occur the 20th floor of a 43 story building. the floor is currently unoccupie.
-
Feb 2021
Suite 500: demolition of existing partitions & associated power/data/cabling, floor finishes, & lighting. construction of full-floor tenant, new partitions, doors, power, lighting, millwork, and finishes. maher n/a.
-
Oct 2021
38th fl t.i: multi tenant fl to new full fl tenant included demolition of partitions, power, flooring, millwork, lighting & finishes. construct of partitions, power, lighting, ceiling, grid/tiles and millwork. all lighting in ste# 3800 to be replaced with new in existing locations to accomdated t-24.
-
Dec 2023
5-7/f: ti demolition of non structural partitions, lighting and finishes. new non structial paritions, ceilings, lighting, millwork & finishes. mep under separate permit.
-
Jan 2024
7th fl mep only: deferred mechanical electrical and plumbing (ref permit 202312192740) for build out.
-
Jan 2024
Ref 202312192740- mep only deferral submittal for 6th floor build out.
-
Sep 2025
Demolition of lighting: const. of new partitions power lighting and finishes of millwork.including corridor and restroom add upgrades. mep life & safety plans will be under seperate permit. path of travel presented and previously approved & for reference only. previous demolition suite refer to permit application 202310319830.
-
Jul 2026
19th fl. suite 1900: suite is currently vacant in shell condition. sow consists of minimal demolition of corridor, incl, entry doors to be replaced, suite build out consists of new offices, mtg rooms, and break area, incl, non structural partitions, ppower clg, lighting finishes and millwork. any changes to mep.
DBI holds 1,533 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 1,533. 8 of them are nominal $1 street-space or sidewalk permits.
The statement dates this tower 1967 on p. 9 and 1968 on p. 36. Not yet documented: the developer and the early tenants. The city's Modern & Postmodern styles context statement dates this building 1968; the assessor's roll records it as built 1966. Submit an update