41–43 South Park
East Cut · San Francisco, CA 94107
-
1930s
Bought with membership dues by the Gran Oriente Filipino Masonic Lodge, one of two residential flats buildings on South Park the lodge acquired.
-
Jan 1982
Additions alterations or repairs.
-
Nov 1983
Remodelling bath room, replace bath tub, shower dr. & floor.
-
Nov 1990
Reroofing.
-
Apr 1991
Reroofing.
-
Jul 2002
Reroofing.
-
May 2011
Remodel 2 kitchens and two bathrooms. remove select no rated lathe and plaster in bedrooms for structural mapping only. replace all removed plaster with 5/8" type x sheetrock. all work shall not trigger sfbc 3404.7.1 "substantial change".
-
Aug 2011
(1) proposed relocate existing 43 south park unit from 2nd floor to 1st floor. (2) proposed infill of rear southwest lightwell at 1st floor. (3) proposed partial infill of northeast side lightwell at all floors. (4) proposed interior remodelling at 2nd floor. (5) proposed minor interior remodeling and.
-
Nov 2011
Install new fire sprinkler system througout including coper underground pipe, total 57 sprinkler heads.
-
Jun 2012
Install hydronic radiant heating system in all (3) floors except closets & stairs. (work in both units) the system will be build in between joist and below floor plywood.
-
Apr 2013
Installation of sprinkelr monitoring system including fire alarm control panel, manual pull station, heat detector & monitor modules for water flow & tamper devices; ti #201108081993.
-
Jun 2015
Return dwelling at gr fl: return stove and wall on ground fl per plans, per planning violation.
-
Jul 2015
Comply with planning department. compliment to close off the opening at stairway of lower unit, reinstall the stove and sink at kitchen area. n/a for maher.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update