617–633 Battery Street
Financial District · San Francisco, CA 94111
Permit history
-
Apr 1983
Build new low partition, etc.
-
Dec 1991
Cti i architectural.
-
Mar 1992
Cti 2 fl 2 (el me sp).
-
Apr 1993
Voluntary seismic upgrade of existingunreinforced masonry building.
-
Jul 1994
Tenant improvement to entire 4/f.
-
Oct 1996
Ti to entire 3rd floor, minor remodeling to 4th floor.
-
Aug 1997
Reroofing.
-
Jan 2002
T.i. includes new offices & rebuild messznine, increase area by 150 sq fttotal less than 1/3 of g/f.
-
Aug 2002
Interior partitions, ceilings, accessible toilet rooms within suite, new finishes.
-
Apr 2005
Oti-1, 2nd/fl - el, me, ls, sp.
-
May 2005
Oti-1 5th floor el.
-
Jul 2007
Roof top air conditioning unit replacement: remove and replace existing "trane"brand chiller on roof & replace with "carrier" brand. new equipment is approx. 2 inches higher, wider by 19" and shorter by 4 ft. weight is less; new matching mounting frame & altered stell support will be installed.
-
Jul 2008
Tenant improvements: build new offices, meeting rooms, toilet rooms and support facilities. install new casework and millwork. electrical, plumbing & mechanical under separate permit. demolition work completed under 200805071511.
-
Sep 2008
6th floor tenant improvment upgrade mechanical & electrical systems, new equipment & lighting. architectural work under permit application 200807297841.
-
May 2011
Tenant improvement to existing office space. remove existing finiahes, lighting, mechanical. new non-structural partitions lighting and mechanical.
-
Jul 2011
This project is a ti to an existing partially occupied floor on the 4th. floor. demolition work includes cosmetic, finishes lighting & hvac. new work consists of new non str partitions, lighting, & hvac. there is no change in floor area or building height. all mep, sprinklers & life safety seperate permit.
-
Jul 2011
Ti to existing partially occupied floor demolition work includes removal of convenience stair, cosmetic finishes, lighting, hvac. new ork consists of infill of removed stair, extension off mezz, non struct partitions, lighting, hvac. no change i floor area, building height. mep sprklers, ls, design build.
-
Oct 2011
Provide new notification & initiating devices to monitor new fire smoke dampers. ref. #201105266916, 201107190577 4th, 201107250982 1st floor.
-
Jun 2013
This project is a t.i to an existing partially occupied floor, demolition work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of building height. all mep, sprinklers and life safety is design build.
-
Jul 2016
Demolition and new non-structural partitions, cabinets, lighting and finishes to portions of 4th and 6th floors. add unisex toilet. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit.
-
Nov 2017
2/f- non structural partitions, restrooms, cabinetry, lighting, finishes & demolition. alter of existing 3/f stair. no change in occ., use, or area. 4 new exterior window openings on north facade. mep, life safety & sprinklers under seperate permit. communicating stair under seperate permit. n/a for maher.
-
Feb 2018
2nd floor: mep permit for application app#201711033091.
-
Jun 2022
1f: interior ti includes new non-structural partitions, doors finishes and lighting. new ada restroom and drinking fountain upgrades.
-
Jun 2022
1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac one unit new exhaust air fan added. new break room sink. new lighting & relocated lighting.
-
Jul 2022
Interior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace existing, new concrete house keeping pad witthin boiler room.
DBI holds 166 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 166. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update