603–615 Battery Street
Financial District · San Francisco, CA 94111
Permit history
-
Jul 1984
Install automatic teller machine in window wall at bank ent.
-
Jun 1993
Partially demolition/remodel exist 5th fl restrooms.
-
Apr 1994
Renewal of application 9309595.
-
Jun 1994
Renovation of existing ground floor.
-
Jul 1994
Restroom remodel 2nd, 3rd, 4th floors-title 24 & ada guidelines.
-
Sep 1995
Cti-1 4/f el me.
-
Oct 1995
Cti i - 3rd floor el-me.
-
Oct 1995
Cti i - 2nd floor el-me.
-
Dec 1995
Cti 1 5th fl el me.
-
Jun 2004
T.i of an existing restaurant. no exterior work.
-
Nov 2004
Restroom accessibility upgrades & stair landing @ door leveledto 6ht floor. electrical, plumbing, **.
-
Dec 2004
Oti-1, 6th floor, el, me, ls.
-
Apr 2012
Demolition only, per ab 017: remove existing paritiion walls, office, gyp, metal framing, carpet, hvac, ducting, tile elecrical circiuts.
-
Jul 2012
4th floor-commercial tenant improvement interior demolition done under separate approved permit application 201204248939. this project incl. additional minor deno, construction of non struct. interior partitions, doors, millwk finishes, ceilings, electrical n lighting. design build m.e.p. under separate pa.
-
Mar 2013
5th floor commercial t.i. - scope includes demolition of electricla & non-structural partitions, construction of new non-structural partitions, doors, millwork, electrical, lighting & finishes. design/build mep under separate permit. project does not alter occupancy or s.f.
-
Apr 2013
5th floor: provide/install an intercommunicating stair between the fourth and fifth floor of 615 battery st.
-
Apr 2013
5th floor-commercial tenant improvement-mechanical & electrical (ductwork, 2 reheat coils, diffusers).
-
Jun 2021
Tenant improvement on the 2nd floor to include demolition of partitions and finishes. construction of non-load bearing partition and ceiling, finishes lighting and millwork.
-
Dec 2022
3/floor: safe off electrical, demolition interior non-bearing partitions, acoustical ceilings and finishes. 7000sf.
-
Jun 2023
Reroofing.
-
Jul 2023
3rd fl - interior ti including new partitions, millwork, finishes, lighting and concrete ramp; demolition includes removal of portion of existing wall to create a new commicating opening between the adjacent building.
-
Aug 2023
3/f: deferred mep: demolition existing and install new duct hvac equipment, connecting power to new or relocated light fixtures, power outlets and tenant equipment, plumbing connections and fixtures to breakroom and mens/women restrooms. ref permit application 202307031378.
-
Dec 2024
New interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demolition of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain.
-
Mar 2025
6th fl: interior alteration of existing office suite. new non structural partitions, millwork, ceilings, finishes. remodel of existing restrooms, new accessible platform lift & alterations to portions of the 5th & 6th fl stairwell.
-
May 2025
6/f: deferred mep submittal for building permit 202503212723 includes mechanical, electrical, and plumbing.
DBI holds 71 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 71. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. The 1990 unreinforced-masonry survey dates the building to 1906; the assessor's roll gives 1907. Submit an update