600 Battery Street

Office building · Financial District

  • 39,875 ft2 lot area
Land$76,970,813
Improvements$51,313,875
Total assessed$128,284,688
37.7974, −122.4007 Street View appears here once a Google Maps embed key is configured.
  1. 1913

    In its natural state the ground lay under the shallow water of Yerba Buena Cove; by 1913 a single narrow rectangular building housing a paper manufacturer stood on the lot.

    San Francisco Planning Department, 640 Battery Street Office Building Expansion: Draft Environmental Impact Report, Case No. 97.678E, 1998.
  2. 1926

    A reinforced concrete and glass light-industrial building put up in 1926 to house the Traung Lithography and Label Company, designed by Maurice Couchot and Jesse Rosenwald, with Gothic Revival detail at the Battery Street entrances and industrial sash windows.

    San Francisco Planning Department, 640 Battery Street Office Building Expansion: Draft Environmental Impact Report, Case No. 97.678E, 1998.
  3. 1937

    An abutting addition of the same height and style was completed in 1937 to Rosenwald's design.

    San Francisco Planning Department, 640 Battery Street Office Building Expansion: Draft Environmental Impact Report, Case No. 97.678E, 1998.
  4. August 1964

    Photographed.

  5. June 25, 1998

    The L-shaped, three-level office building, with facades on Pacific Avenue and Battery, Jackson and Front Streets and built in 1926-37, was the subject of a draft environmental impact report on adding three floors and about 93,500 square feet of offices and recladding it.

    San Francisco City Planning Commission minutes, San Francisco Public Library (Internet Archive)
  6. Aug 1998
    Permit 9816406 $$$ $12,500,000

    One stop-add 3 floors to exist.building.seismic retro and mechanical.

  7. August 20, 1998

    The City Planning Commission certified, 6-0, the final environmental impact report for adding three floors and about 93,500 square feet of offices to the L-shaped office building, built in 1926-37, and recladding it (Motion 14678).

    San Francisco City Planning Commission minutes, San Francisco Public Library (Internet Archive)
  8. November 12, 1998

    The City Planning Commission approved, 6-0, a bulk-limit exception and about 99,530 square feet of added offices for the office building, reversing its 1 October motion of intent to disapprove (Motions 14726 and 14727).

    San Francisco City Planning Commission minutes, San Francisco Public Library (Internet Archive)
  9. Feb 1999
    Permit 9903260 $$$ $300,000

    New structural work at bsmnt level only.

  10. Jun 1999
    Permit 9912937S $$$ $6,000,000

    Renovation of existing building.

  11. Sep 2008
    Permit 200809252619 $$$ $1,400,000

    1st & 2nd floor tenant improvement to include new non-load bearing partitions, demountable partitions, millwork, fixtures, doors & finishes. mep & l.s. under separate permits.

  12. Dec 2008
    Permit 200812228985 $$$ $120,000

    1st fl.mechanical work associated with approved appl #200809252619.

  13. Apr 2011
    Permit 201104123894 $$$ $250,000

    Tenant improvement for partial 1st. floor. to construct millwork finishes and non-load bearing partitions. mep sep permit including lighting.

  14. Sep 2013
    Permit 201309187114 $$$ $125,000

    1st floor: t.i. on ground floor to build partitions, doors, frames, millwork, and finishes.

  15. Nov 2013
    Permit 201311262936 $$$ $40,000

    Ground floor - electrical for t.i. to install new lighting & equipment, ref permit application 2013.0918.7114.

  16. Aug 2020
    Permit 202008313000 $$$ $750,000

    Demolition existing non-structural lobby finishes and construct new lobby finishes.

  17. Aug 2020
    Permit 202008312997 $$$ $170,466

    Ada upgrade and path of travel upgrade for primary entrance.

  18. Sep 2020
    Permit 202009023304 $$$ $1,875,000

    Partial renovations & non-structural demolition of roof deck and new lobby doors on ground floor.

  19. Sep 2020
    Permit 202009285322 $$$ $320,000

    Remove & replace existing boiler skid with new like for like skid. disconnect existing electric rooms from exhaust system. install new transfer fans to serve existing electrical rooms.

  20. Nov 2020
    Permit 202011209443 $$$ $239,455

    1, 2, 3 floors: demolition of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on floor 1, 2 & 3. no structural demolition. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017.

  21. Nov 2022
    Permit 202211216981 $$$ $14,250,000

    Priority process ab-004: tenant improvement: demolition of non-structural interior partitions, finishes & associated mep. addition of new non-structural interior partitions, finishes & associated mep. upgrade existing restrooms to comply with new occupancy/plumbing calcs.

  22. Mar 2023
    Permit 202303294590 $$$ $125,000

    Interior demolition of existing non structural partitions, doors, millwork, ceilings, flooring & other finishes, hvac, electrical (including lighting), plumbing & equipment. this demolition work is in preparation for future ti work under pa 2022-1121-6981.

  23. Aug 2023
    Permit 202308315678 $$$ $150,000

    Fire alarm, new notifier nfs2-3030 addressable fire alarm system with emergency voice alarm system installed as part of tenant improvement renovation. emergency voice is req due to stairwell occupancy load. this ti is for whole building ref 202211216981.

  24. Dec 2023
    Permit 202312011778 $$$ $100,000

    Revision to 202211216981, addendum 2 changing combiined facility restrooms to separate facility restrooms.

  25. Jun 2024
    Permit 202406204855 $$$ $850,000

    Basement-2nd floor office ti to inlcude partial demolition of non structural partitions. new partitions, lighting, and finishes. modify existing restrooms, break room and coffee bar. mep deferred under separate permit. replacing 7 wcs in mens restrooms with 7 urinals. no change to use or occupancy.

  26. Aug 2024
    Permit 202408219124 $$$ $154,000

    Basement to 2nd/f-deferred mep for t.i. 202406204855.

  27. Dec 2025
    Issued Permit 202512121681 $$$ $1,079,200

    Interior only impovement at basement. selective demolition of partitions/doors. new partitions, new doors for new huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy.

DBI holds 75 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 75. 2 of them are nominal $1 street-space or sidewalk permits. 4 expired permits are not shown. The 1998 environmental review for the 640 Battery Street office building expansion dates the first structure on the site to 1926 in one chapter and to 1927 in another, and in one place gives 600 Battery Street as the 1927 building and 640 Battery Street as the 1937 addition.