643–649 Front Street
Chinatown · San Francisco, CA 94111
-
August 30, 1957
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
September 11, 1957
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Aug 1992
Constr 2 new offices-new conf rm-close pass wy-expr p/c.
-
Feb 1993
Reroofing.
-
Aug 2002
Umb ordinance to an existingunreinforced masonry building.
-
Jun 2004
Oti-1 2/f el me sp.
-
Jul 2004
Lobby restroom remodel and retrofit existing fire sprklr system on all floor only.
-
Jul 2004
Oti-2, 2nd /fl-el, me.
-
Aug 2004
Revised lobby - add (1) new air cooled heat pump revised toilet- reconnection of existing ductwork. refer.
-
Aug 2004
32 sprinkler heads on 2nd fl added for dropped ceiling existingsystem.
-
Aug 2006
Oti-1, 3rd floor, el, sp.
-
Aug 2006
Install 49 new fire sprinklers on 3rd floor only.
-
Jan 2007
Install 2 new roof top package heat pumps and convert to existing duct work. sd's for each heat pump will be insulated on seperate permit application.
-
Dec 2007
Work on bsm &1st fl. upgrade existing vacant office space installnewlighting& outlets, relocate stair to bsmnt for exit separation. infill 3 openings in floor, minor partition additions on bsmnt. no change mechanical.system. sprinkler under separate pa.permit application 2002.08.02.3052 for ada compl.no change toexistingfenest.
-
Mar 2008
Revision to permit application 2007/12/28/1530 to remodel ex. basement restroom for accessibility, add 3 offices and telecom rm at 1st floor, revise and simplify lighting plans.
-
Sep 2008
Install split heat-pump units (ac units) for basement & ground floor office tenant improvement.
-
Dec 2014
Repair from water damage, drywall paint, approx 2500 s.f. drywall replacement, minor electrical repair. n/a ordinance #155-13.
-
Jan 2015
Drywall, paint, small electrical, small plumbing, repair water damaged, replace in kind, no work to floor. n/a ordinance #155-13.
-
Mar 2017
Suite 100: install kitchen cabinets, dishwasher, sink, & fridge per office use. n/a for maher.
-
Nov 2021
Non-structural tenant improvement. sow: new partitions. fully sprinklered. interior only. no work in prow. mep, sprinklers, life safety deferred.
-
Dec 2021
1/f: add 3 new fire sprinklers. relocate 9 existing sprinklers. no other work to system. ref ti permit 202111222919.
-
Mar 2022
Hvac duct demolition and cap as necessary. frabricate and install 9 transfer air sleeves through wall and install a wall grille on each side. tap existing ductwork and run new supply air branches to new rooms as necessary. furnish and install 9 new supply air diffusers, mechanical insulation per title 24.
-
Mar 2022
Revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the area.
-
Oct 2024
2/fl-demolition and construction of no load bearing partitions for new offices, conference room, break area a server room new ceilings, lighting millwork, and finishes. mep deferred.
-
Dec 2024
Relocate (10) pendents. ref to t.i. 202410102713.
-
Dec 2024
2/f: mechanical and electrical - ref bpa# 202410102713.
DBI holds 41 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 41. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update