750 Battery Street
Office building · Financial District
-
Jul 1980
New construction wood frame.
-
September 4, 1980
On discretionary review the City Planning Commission approved, 5-0 and with conditions, seven storeys of offices over the existing storey of parking (Resolution 8704).
-
Jul 1983
Alteration site.
-
1986
Built.
-
May 1986
Interior tenant renovation with new stair btw 5th & 6th floors.
-
Aug 1986
Partitions, electrical, plumbing, mechanical, carpeting, hvac.
-
Sep 1989
Office tenant improvements incl arch, electrical mechanical & sprkl.
-
Nov 1989
T/i incl. partitions/walk, finishes (arch. only).
-
Oct 1996
Cti-1 6/f el me sp.
-
Jul 2013
Suite #100: not a high rise. t.i. demolish offices ceiling tile and flooring, provide new ceiling, lighting and break room configuration. fire sprinklers and alarm under seperate permit.
-
Oct 2014
Tenant improvement new rooms studios breakroom, reception area training rm mep sep permit.
-
Oct 2014
Tenant improvement, new rooms studios breakroom, 2 handicap bathrooms, reception area mep under sep permit.
-
Nov 2014
2nd floor: mechanical & plumbing for t.i. appl. 2014.1024.9800; 3rd floor: mechanical and plumbing for 201410249801; maher n/a.
-
Nov 2015
3/f -remodel & new finishes to training room, green room and chair room. n/a for maher. life safety deferred.
-
Dec 2015
Full floor tenant improvement. barrier removal at 6th fl toilet rm. n/a ordinance #155-13.
-
Nov 2016
Tenant improvement of suite 150 including minor demolition, new finishes, and new millwork. fire ls under separate permit., existing hvac systems to remain.
-
Feb 2017
5th floor #500 - tenant remodel existing restrooms to meet ada & local codes. removal of (e0 millwork open office work stations & reinstall systems. remodel tenant breakroom & copy room, new carpet & paint throughout. new community room. n/a maher ordinance.
-
Dec 2021
Minor demolition & construction on non-load bearing walls for reconfiguration of private offices, new finishes, electrical & mechanical.
-
May 2022
Ste 350: interior tenant improvement only including new partitions, doors, flooring.
-
Jul 2024
Interior tenant improvements to existing office building. finish updates to lobby area. entry door replacement. level 1 restroom renovation. no mechanical work.
-
Jan 2026
Tenant improvement on the 7th floor to include new non-structural partitions, acoustical ceiling, finishes, millwork, single user restroom. mep included.
-
Jan 2026
7/f: bathroom full remodel. full removal of existing fixtures and finishes new fixtures and finishes and lightening and devices signage. deferred fire & mep.
-
Feb 2026
6/fl- soft demolition of non sturtcrual partitions, finishes and fixtures. install new lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered.
-
Aug 2026
4th floor: interior demolition & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demolition/install of nw finishes & fixtures mechanical/electrical defer.
DBI holds 175 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 175. 2 expired permits are not shown.
Nearby
- 717 Battery Street Same street
- 815–875 Battery Street Same street
- 747 Front Street Same block
- 298 Pacific Avenue Same block
- 150–160 Broadway Around the corner
- 100–120 Broadway Around the corner
- 838 Sansome Street Around the corner