815–875 Battery Street
Office building · Financial District
-
1907
Built.
-
August 1911
The American Biscuit Company's plant, put up soon after the 1906 fire, was designed by architect Ralph W. Hart, who was kept on as the company's architect for further alterations.
-
April 10, 1926
A permit was sought for alterations: install biscuit bake oven, estimated at $1,500. Baker, Perkins Co., Inc. was named as contractor. The owner was the American Biscuit Co.
-
Jan 1982
Additions alterations or repairs.
-
Nov 1992
Upgrade emerg electrical distr sys.improvemts incl encl & penthse.
-
Mar 1995
Cti 1 4th floor el me.
-
May 2001
T.i./building on 2/fl./mechanical under seperate permit for h.cap only lift front of building.
-
Jun 2004
Oti-1 2nd/fl-me, sp, ls, el.
-
Oct 2004
Electrical & mechanical for appl# 2004/06/25/7347 on 2nd floor.
-
Jun 2005
Drywall, acoustic ceiling, finishes.electrical. & mechanical on seperate permit.
-
Nov 2010
Remove and replace 2 chillers and replace with two new energy efficient chillers.
-
Oct 2011
Remove 1 3500 mbh boiler & replace with 3 1000 mbh high efficiency boilers. install 1 400 mbh domestic hot water boiler.
-
Oct 2011
Demolition of minimal walls & adj, ceiling, flooring & the construction of new office, conf room, coffee bar, existing break room additions and an eng control room for the news station. the project includes new finishes and furnace for open offices, and new electrical, & plmg work to be under seperate pmt.
-
Aug 2012
Suite #100-the existing tenant built up will be demolished under this project. the existing ada code complaint restrooms #102 & 103 will remain. in addition 2 ada complaint unisex restrooms will also be added.
-
May 2013
Tenant improvement on 1st fl to construct new non-load bearing partition, doors, frames, millwork & finishes. mep, sprinklers and life safety to be submitted under seperate permit.
-
Jul 2015
5th floor: renovation of designated area to a tv produection/sound studio. the work includes: mechanical, electrical, plumbing, low voltage data and fa. demolition under different permit #201505146393. maher na.
-
Aug 2015
4th floor- project consists of demolitoin of finish flooring, partitions, doors, ceiling, furniture, & relocation of workstations. new work scope includes carpet, furniture, ceiling tile, casework, door, & transaction window. mep, life safety, sprinkler modification to be separate permit. no struct.
-
Jun 2017
Replace air handling unit at roof top. n/a ordinance #155-13.
-
Jul 2017
3/f- t.i. on a multi tenant floor to demolition existing partitions, ceiling, millwork & finishes. construct new walls, ceiling work with new lighting, power/data & finishes, full ada compliance restrooms. mep, life safety & sprinkler separate. no structural work in this scope. n/a ordinance #155-13.
-
Sep 2017
3rd fl - mechanical and electrical for pa 2017-0721-2569. maher na.
DBI holds 231 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 231. 31 of them are nominal $1 street-space or sidewalk permits. 8 expired permits are not shown.
Nearby
- 750 Battery Street Same street
- 840–848 Battery Street Same street
- 245 Vallejo Street Same block
- 150–160 Broadway Around the corner
- 1000 Sansome Street Around the corner
- 838 Sansome Street Around the corner