1 Bush Street
Financial District · San Francisco, CA 94104
Public art
- Bronze Fountain — David Tolerton
Bronze; In west side of sunken POPOS, along Sansome Street frontage; artwork is always accessible.
Installed 1959.
Permit history
-
Oct 1981
Additions alterations or repairs.
-
Mar 1988
Base building alterations.
-
Apr 1988
Tenant alterations, no increase in overall floor space.
-
Oct 2008
Reconfiguration of floor to accomodate new conference rooms, new offices, new floating workstations & new finishes.
-
Dec 2012
T.i on the 8th floor to build new non-structural partitions in existing vacant space, mechanical, electrical & plumbing included.
-
May 2013
Tenant improvement on 7th floor to construct new non-load bearing partitions, doors, millwork and finishes and new mep equipment.
-
Jun 2013
Suite 1100: full floor interior construction of new non-load bearing partitions, glazing doors & millwork. mep deferred. life safety & fire sprinkler under separate permit.
-
Aug 2013
9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit.
-
Aug 2013
10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit.
-
Feb 2014
17/f & 18/f t.i. include new non load bearing partitions, ceilings and finishes and associated mechanical and electrical. ls and sprinklers under seperate perit.
-
May 2014
14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit.
-
Jan 2015
Suite 1300 t.i. to a 7500 sq ft suite on the 13th floor to include new interior partitions millwork and finishes. mep included.
-
Feb 2015
12th floor: full floor interior construction of new, non-load bearing partitions, glazing, doors, millwork, lighting and associated electrical and mechanical. life safety under separate permit.
-
Sep 2016
15th fl: minor demolition of partitions, doors, millwork, light/ceiling & finishes. construction of a new offices break room & conference room. new finishes, partitions, doors, ceiling, light fixtures, & millwork. floor is currently unoccupied. mep, sprnk, & l/s upgrade to be under seperate permits.
-
Jan 2019
5th fl ti includes demolition of non bearing interior paritiions, plumbing fixtures, mechanical equipment (ducts, electrical wor, improvements include new non bearing interior partitions, doors, glass partitons, finishes, lighting, mechanical work. fire alarm deferred. structural deferred. maher n/a.
-
Dec 2019
4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred.
-
Feb 2022
13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred.
-
Jun 2022
Subbasement: replace existing chiller and pumps with new.
-
Aug 2022
9/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance. new employee pantry and operable partition with associated structural support.
-
Aug 2022
10/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance. new employee pantry.
-
Mar 2023
18th/f office t.i. demolition existing partition & ceiling. new partitions and finishes, mep included.
-
Jul 2024
17th fl- interior ti includes new non structural parititions, ceilings, finishes & mep.
-
Mar 2025
19/fl- install (3) cooling towers interior.
-
May 2025
15/f level 15: interior tenant improvement. minor non-structural demolition. new non-structural partitions, lighting, finishes, including restrooms. mep deferred.
-
Aug 2025
Defered mep for approved permit application 2025-0305-1636 15th fl.
DBI holds 579 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 579. 1 of them are nominal $1 street-space or sidewalk permits.
One Bush Plaza
Built for the Crown Zellerbach Corporation, this was the first glass curtain-wall tower in San Francisco and the first major building downtown in the thirty years after the Depression. Crown Zellerbach was taken over by Sir James Goldsmith in 1985; the building became San Francisco Landmark No. 183 in 1987.
Edward Charles Bassett designed the sunken triangular plaza with olive and mayten trees over a ground pattern of river rock and slate, screened from the pavement twelve feet above by an angular granite wall. David Tolerton (1907–2000) made the bronze fountain on the travertine deck; it is one of two he made in the Bay Area.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update