1 Bush Street

Financial District · San Francisco, CA 94104

  • Built 1959
  • Office building
  • 19 stories
  • Zoned C3O
  • District 3
  • Privately owned public open space
  • Historic status: historic resource
  • City landmark (Article 10)
37.7911, −122.4001 Street View appears here once a Google Maps embed key is configured.
319,234 sq ftBuilding area
47,014 sq ftLot area

Public art

  • Bronze Fountain — David Tolerton
    Bronze; In west side of sunken POPOS, along Sansome Street frontage; artwork is always accessible.
    Installed 1959.

Permit history

  1. Oct 1981

    Additions alterations or repairs.

    Cancelled Permit 8109388 $$$ $750,000
  2. Mar 1988

    Base building alterations.

    Complete Permit 8803311 $$$ $1,000,000
  3. Apr 1988

    Tenant alterations, no increase in overall floor space.

    Complete Permit 8804402 $$$ $2,190,000
  4. Oct 2008

    Reconfiguration of floor to accomodate new conference rooms, new offices, new floating workstations & new finishes.

    Complete Permit 200810103906 $$$ $1,000,000
  5. Dec 2012

    T.i on the 8th floor to build new non-structural partitions in existing vacant space, mechanical, electrical & plumbing included.

    Complete Permit 201212286961 $$$ $850,273
  6. May 2013

    Tenant improvement on 7th floor to construct new non-load bearing partitions, doors, millwork and finishes and new mep equipment.

    Complete Permit 201305177212 $$$ $1,400,000
  7. Jun 2013

    Suite 1100: full floor interior construction of new non-load bearing partitions, glazing doors & millwork. mep deferred. life safety & fire sprinkler under separate permit.

    Complete Permit 201306129324 $$$ $1,143,513
  8. Aug 2013

    9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit.

    Complete Permit 201308013346 $$$ $1,374,300
  9. Aug 2013

    10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit.

    Complete Permit 201308013349 $$$ $1,374,300
  10. Feb 2014

    17/f & 18/f t.i. include new non load bearing partitions, ceilings and finishes and associated mechanical and electrical. ls and sprinklers under seperate perit.

    Complete Permit 201402279442 $$$ $1,935,000
  11. May 2014

    14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit.

    Complete Permit 201405236646 $$$ $1,115,000
  12. Jan 2015

    Suite 1300 t.i. to a 7500 sq ft suite on the 13th floor to include new interior partitions millwork and finishes. mep included.

    Complete Permit 201501266672 $$$ $817,500
  13. Feb 2015

    12th floor: full floor interior construction of new, non-load bearing partitions, glazing, doors, millwork, lighting and associated electrical and mechanical. life safety under separate permit.

    Complete Permit 201502208884 $$$ $1,450,000
  14. Sep 2016

    15th fl: minor demolition of partitions, doors, millwork, light/ceiling & finishes. construction of a new offices break room & conference room. new finishes, partitions, doors, ceiling, light fixtures, & millwork. floor is currently unoccupied. mep, sprnk, & l/s upgrade to be under seperate permits.

    Complete Permit 201609228519 $$$ $867,000
  15. Jan 2019

    5th fl ti includes demolition of non bearing interior paritiions, plumbing fixtures, mechanical equipment (ducts, electrical wor, improvements include new non bearing interior partitions, doors, glass partitons, finishes, lighting, mechanical work. fire alarm deferred. structural deferred. maher n/a.

    Complete Permit 201901241193 $$$ $2,500,000
  16. Dec 2019

    4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred.

    Complete Permit 201912139467 $$$ $1,200,000
  17. Feb 2022

    13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred.

    Complete Permit 202202047388 $$$ $1,400,000
  18. Jun 2022

    Subbasement: replace existing chiller and pumps with new.

    Issued Permit 202206236914 $$$ $1,500,000
  19. Aug 2022

    9/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance. new employee pantry and operable partition with associated structural support.

    Complete Permit 202208150544 $$$ $2,400,000
  20. Aug 2022

    10/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance. new employee pantry.

    Complete Permit 202208150546 $$$ $2,200,000
  21. Mar 2023

    18th/f office t.i. demolition existing partition & ceiling. new partitions and finishes, mep included.

    Complete Permit 202303214057 $$$ $1,100,000
  22. Jul 2024

    17th fl- interior ti includes new non structural parititions, ceilings, finishes & mep.

    Complete Permit 202407317686 $$$ $3,073,800
  23. Mar 2025

    19/fl- install (3) cooling towers interior.

    Issued Permit 202503132182 $$$ $850,000
  24. May 2025

    15/f level 15: interior tenant improvement. minor non-structural demolition. new non-structural partitions, lighting, finishes, including restrooms. mep deferred.

    Complete Permit 202503051636 $$$ $3,258,010
  25. Aug 2025

    Defered mep for approved permit application 2025-0305-1636 15th fl.

    Complete Permit 202508082627 $$$ $195,000

DBI holds 579 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 579. 1 of them are nominal $1 street-space or sidewalk permits.

One Bush Plaza

Built for the Crown Zellerbach Corporation, this was the first glass curtain-wall tower in San Francisco and the first major building downtown in the thirty years after the Depression. Crown Zellerbach was taken over by Sir James Goldsmith in 1985; the building became San Francisco Landmark No. 183 in 1987.

Edward Charles Bassett designed the sunken triangular plaza with olive and mayten trees over a ground pattern of river rock and slate, screened from the pavement twelve feet above by an angular granite wall. David Tolerton (1907–2000) made the bronze fountain on the travertine deck; it is one of two he made in the Bay Area.

Not yet documented: the developer, the early tenants and who designed the open space. Submit an update