100–120 Bush Street
Financial District · San Francisco, CA 94104
-
1929
Built.
-
1929
The Shell Building, designed by architect George Kelham.
-
Oct 1981
Additions alterations or repairs.
-
Oct 1988
Elevator modernization.
-
Apr 1989
Renovation of main lobby & provision for handicapped access.
-
Apr 1991
Cti1.
-
Apr 1991
Repair & maintenance to exterior terra cotta.
-
May 1991
Cti-1.
-
Jun 1991
Tenant improvement.
-
Nov 1991
Cti- 1 fl-7 el sp.
-
Nov 1991
Renovate lobby & toilet on 7/f.
-
Apr 1996
Provide & install window cleaning equipment.
-
Dec 1997
Oti-2 floor 3rd el me l/s.
-
Jul 1999
Oti-1 4th floor electrical mechanical sprinkler.
-
Nov 2001
1/fl-remove barrier-create ramped access/corridor to existingtoilets, remodel men's room/pkg garage/offic.
-
Jun 2002
Oti-1 24th floor, el, me, ls, sp.
-
Jun 2002
Oti-1, 20th floor, el, ls, sp.
-
Mar 2005
Demolition only as allow per adm bulletin 17.interior work only. no increase office space.
-
Jan 2007
Oti-1, tmg partners, 25th fl, el, me, ls, sp.
-
Aug 2010
Basement level & sub-basement - replace 2 existing boilers, 1 existing supply fan, 1 existing feed water tank and 1 existing chemical feeder.
-
Sep 2010
Office ti on the 21st fl. demolition of non struc partitions, build new non struc partitions. all new or revised hvac, plumbing, sprinkler and ls work will be design build under separate permit. floor is fully sprinklered.
-
Mar 2012
Tenent improvement: add 4 new offices, 3 conference rooms & a break room to existing space. mep and life safety under separate permits.
-
Oct 2014
Work at 2nd floor courtyard: demolition of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane, pour new concrete topping slab. maher not req.
-
Nov 2015
22nd floor- construct new men's & womens restrooms (accessible). demising of existing suite into (2) suites. work includes (2) extended pipe to feed new suites, (1) new urinal, 3) toilets, (4) restroom lavatories. relcoate existing lighting & add wall sconce lighting at restroom. new exhaust & supply duct & fans.
-
Jan 2016
Tenant improvement of 3338 sq ft office space including new floor, paint, lighting, partitions, mechanical, fans, plumbing rough in.
-
Jun 2018
Repair terrocotta spalls with mortar and glaze. repaint window frames.
-
Jun 2020
9th fl/suite 900, t.i. includes demolition of non-str. partitions and building new non-str. partitions; ada upgrades; new electrical work included in this permit; mechanical., plumbing, life safety and sprinklers will be design build if needed and submitted separately. building is fully sprinklered.
DBI holds 426 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 426. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 1 Bush Street Same street
- 130 Bush Street Same street
- 100–130 Sansome Street Same block
- 235 Pine Street Same block
- 140–142 Sansome Street Same block
- 201–221 Pine Street Same block
- 2–22 Battery Street Around the corner
- 98 Battery Street Around the corner