235 Pine Street
Financial District · San Francisco, CA 94104
Public art
- Called to Rise — Thomas Marsh, Qiliu Pan
Bronze; above office building entrance; artwork is always accessible.
Installed 1990. The city's inventory credits Thomas Marsh, Qiliu Pan; the source cited here gives Thomas Marsh.
Permit history
-
Sep 1983
New construction.
-
Sep 1984
New construction.
-
Jul 1991
Tenant interiors.(express 23.).
-
Jul 1991
Tenant interiors.
-
Jul 1991
Tenant interiors.
-
Jul 1991
Tenant interiors (express 19).
-
Jul 1991
Tenant improvement ( express 21).
-
Jul 1991
Tenant interiors ( express 20).
-
Mar 2004
Oti--1, 12th fl, el, me, ls, sp.
-
Aug 2011
Improvements for 17th. floor. tenant space @ 235 pine t. for use as an arch. off. work incl. minor demolition fo existing walls & relocation of entrance doors. new constr. to incl. int. partitions relocation of clg. tilesm, new doors, minor additions to mechanical. systems, new kit. area, lights & other electrical. fixt. &.
-
Oct 2011
10th floor ste 1000 - interior tenant improvement & demolish existing partitions, ine interior partitions, millwork, new carpet & paint, reworking existing doors, lighting & existing mechanical.
-
Nov 2013
Demolition of existing non -structural interior partitions, doors, frames, hardware, millwork, finishes, mechanical, electrical, & plmg. construction of non structural partitions, door, frames, hardware, millwork, drywall, finishes, mechanical, electrical, & plmg. fire sprnkr & life safety is design building by g.c.
-
Aug 2015
13th floor: interior remodel of existing'g tenant space. new interior partitions, new millwork, lighting, new ceiling. new fire rated 's' doors and won-door partition at elevator lobby per pre-app agreement. mechanical, sprinklers, fire alarm under sep. permits.
-
Jan 2016
Interior office remodel of existing office space. demolish existing walls, new non-structural interior partitions, new millwork, new ceiling at private offices, new electrical. rework existing mechanical. electrical, plumbing, fire/life safety deferred. maher na.
-
Jul 2016
19th floor: ti involves minor demolition. new partition walls, doors & hardware, millwork, finishes inclusive of new ceiling system, selected specialities, equipt and furnishings, voice & data cabling to idf closet and downstream to work stations, private offices, conference & mtg rooms. maher na.
-
Jul 2016
Complete interior ti that includes minor demolition, new partition walls, doors & hardware, millwork, finishes inclusive of new ceiling system, selected specialties, equipment, and furnishing as shown on drawings. voice & data cabling to idf closet and downstream to work stations, private offices.
-
Feb 2017
21st floor ti includes demolition of non-structural partitions and doors, build back new non-structural partitions etc. all new or revised mep, life safety and sprinklers will be design build and submitted separately.
-
Mar 2017
Existing tenant improvement to include selective demolition and construction of partitions, new ceiling grid and tile, new light fixtures and switching, new office doors, frames, millwork, sink, and new finishes.
-
Oct 2017
22nd floor: modification of an existing t.i. to include selective demolition and construction of partitions, new ceiling tile+grid, new light fixtures, switching, new office doors and frames, new millwork sink and new finishes. n/a for maher.
-
Oct 2017
23rd floor: modification of an existing t.i. to include construction of partitions, new ceiling tile+grid, new light fixtures, switching, new office doors and frames, new millwork sink and new finishes. n/a for maher.
-
Oct 2018
Ti on the 14th fl to include new non-structural partitions, new or revised hvac, electrical and plumbing. n/a for maher.
-
Aug 2020
17th fl, ti - minor demolition of existing partitions & addition of entrance door. new construction to include interior partitions, minor work with existing ceiling tiles, new doors, minor addition to existing mechanical systems, new break area, new light fixtures & additions to existing electrical fixtures & equipment.
-
Jan 2023
Demolition and construction of non load bearing partitions, e modifications t oceiling grid and tile reswitching. new doors, frames, new millwork, new sinks, new finishes. ste 1800.
-
Dec 2025
Ti at 7th floor: ti of an office area. installing modular wall panel system 8.0" tall with intergrated low voltage.
DBI holds 344 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 344. 1 of them are nominal $1 street-space or sidewalk permits.
Twenty San Franciscans
Called to Rise shows twenty figures from the city's history — among them Juan Bautista de Anza, Eadweard Muybridge, Phoebe Apperson Hearst and Amadeo Peter Giannini — with two bronze panels explaining what each did. The city's inventory credits Thomas Marsh and Qiliu Pan; the published account of the work names only Marsh.
Not yet documented: the architect and builder, the early tenants and who designed the open space. Submit an update