201–221 Pine Street
Financial District · San Francisco, CA 94104
Permit history
-
Mar 1991
Add structural steel frame gunite wall brick floor connectn.
-
Mar 1992
Install auto fire sprinkler system.
-
Apr 1994
T/i install new kitchen & new bathrm install interior finish.
-
May 2002
Reroofing.
-
Sep 2005
Remove & replace sidewalk.no plumbing & no electrical.
-
Dec 2005
Replace e cookline equip n grn floor: equip at cntr. upgrade non ada compliant sales counter with new compliant counter, n automatic door opener for e restroom, type 1 hood and duct requ under seperate permit.
-
Jun 2010
3rd floor - remove existing sheetrock, electrical/data, non-structural partition walls, existing lighting fixtures, carpet, ceiling panels, existing millwork per ab-017.
-
Mar 2011
3rd floor, tenant improvement: adding partition walls for vestibule, conf. rm., 2-offices & enclose existing breakroom area; replace existing break room sink; ada upgrades to restrooms. hvac under separate permit.
-
Apr 2011
Install new furnace and ductwork in shell office space. ti 201103021218.
-
Mar 2013
5th floor t.i include demolition & constuction of non-bearing partition walls to create private offices. conference room & enclose existing break room; replace existing sink & cabinets in break room, ada upgrade to restrooms.
-
Mar 2013
4th floor-tenant improvement includes demolition & construction of non bearing partition wall to create private offices, enclose existing breakroom. replace existing sink & cabinets in breakroom. ada upgrades to restrooms.
-
Apr 2013
6th floor tenant improvements include demolitoin & construction of non-bearing partition walls to create private offices & enclose existing break room, replace existing sink & cabinets in break room, ada upgrades to restrooms.
-
Apr 2013
6th floor-commercial t.i fire sprinkler work-64 total sprinkler heads. hydraulically calculated per nfpa 13.
-
Apr 2013
4th floor-commercial t.i fire sprinkler work-36 total sprinkler heads.
-
May 2013
4th, 5th, 6th floor - 3 new gas furnaces & ductwork. ref t.i. #2013.0322.2836, #2013.0315.2311, & #2013.04.03.3686.
-
Jun 2015
Replace existing type 1 hood maher not req.
-
Nov 2017
Re-construct sub-sidewalk basement to install ada compliant curb ramps.
-
Apr 2023
Remodel basement, 1st & 2nd fl. for new restaurant in an existing 6 story building. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes new main stair, new kitchens at all 3 fls, new bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit.
-
Jul 2023
New exterior entry doors in existing locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained.
-
Dec 2023
Soft demolition on basement, 1st and 2nd floors per ab-017. all remain vacant.
-
May 2024
T.i.: modifications to existing wet pipe fire spirnkler system for the remodeled basement, 1/f & 2/f. ref permit application 202304045050.
-
May 2024
Fire only: fire alarm system tenant improvement: basement, 1st, and 2nd floor: ti- 202304045050.
-
Oct 2024
Furnish and install 3 ansul r102 fire systems in the main kitchen area on the gr fl.
-
Mar 2025
Install 6 awnings 48" x 121" x 48" projection ref permit application 202307283259 & 20304045050.
DBI holds 74 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 74. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update