200–216 Pine Street
Financial District · San Francisco, CA 94104
-
1907
Built.
-
1907
The Liberty Mutual Building was built on the northwest corner of Pine and Battery. The Foundation for San Francisco's Architectural Heritage later rated it "C".
-
1939
The Liberty Mutual Building was remodelled, the first of two remodellings; the second came in 1973-74.
-
Jul 1984
Stucco outside of building.
-
Sep 1985
Remodeling in 6th & 7th.floors, new plumbing and lighting.
-
Sep 1985
Main entrance lobby to be remodeled to make it conform.
-
Nov 1985
Remodelling office space.
-
Jul 1987
Remodel office area & handicap upgrade of toilet rooms.
-
May 1989
Alter existing stair from basement to second floor.
-
May 1989
Alter 4th and 5th floors toilet rooms for handicapped.
-
Aug 1989
New sprinkler lines in basement & new base building sprinkler.
-
Apr 1991
Cti-1.
-
Apr 1991
Cti-2.
-
May 1991
Cti 1 2nd floor.
-
Jun 1991
Cti ii floor 2nd.
-
Nov 1991
New deli shop @ ground floor.
-
Mar 1993
Cti 1 fl 02 ( el me sp).
-
Mar 1994
Acoustic ceiling, drywall, electrical, hvac, fire sprinklers.
-
Oct 1995
Cti-1 floor 5th el me sp.
-
Mar 1999
Tenant improvements, partitions, plumbing/electrical.
-
Jul 2000
Termite work, dry rot around the garage header and garage wall.
-
Apr 2002
Convert retail cell phone sale to deli (sub-way)sandwiches; all work on 1st floor #100.
-
Aug 2004
Install h. c countor & lighting & small storage.
-
Jun 2006
Remodel existing retail space on ground floor to include new lighting, electrical outlets, new counters. upgrade restrooms for disable access.. adjust front door.
-
Aug 2013
Construct new room in open office area. toilet accessibility upgrades to 20%. mep under separate permit.
-
Feb 2026
Construct new screen wall to shield restroom door from service rear areas. new door & frame. existing hood exhaust fan & make-up air unit to be upgraded with new fan. minor electrical for new equipment. no changes to existing lighting, minor plumbing for new grease interceptor and dish washer. no changes to existing.
-
Jul 2026
Concrete repair in basement: repair at concrete walls, beams and soffit, include beam replacement at seven sections of beam. perform epoxy crack injection and concrete spall repairs. all repairs in kind to match original construction.
DBI holds 88 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 88. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 140–160 Pine Street Same street
- 201–221 Pine Street Same street
- 200–206 Sansome Street Same block
- 222–238 Sansome Street Same block
- 311–325 California Street Same block
- 351 California Street Same block
- 98 Battery Street Around the corner
- 160–180 Sansome Street Around the corner