37.7929, −122.4007 A locator map appears here once a Mapbox token is configured.

351 California Street

Financial District · San Francisco, CA 94104

  • Office building
  • 16 stories
  • Zoned C3O
  • District 3
  • Historic status: historic resource
37.7929, −122.4007 Street View appears here once a Google Maps embed key is configured.
140,000 sq ftBuilding area
11,553.09 sq ftLot area
  1. 1920

    Built.

  2. 1920

    The building went up as the Balfour Building to the design of George Kelham — a two-part vertical composition with a dark textured brick facade over a carved limestone base, restrained Renaissance and Baroque ornament outside and in its vaulted ground-floor elevator lobby, on a steel frame. It shortly became part of the Dollar Lines group of buildings and was renamed the J. Harold Dollar Building. The Foundation for San Francisco's Architectural Heritage rated it "B".

    333 California Office/Residential Building DEIR, SF Dept. of City Planning, 1982
  3. Jun 1982

    Building use: offices.

    Complete Permit 8205070 $$$ $15,000
  4. Sep 1983

    Remodel restrooms to provide access for physically handicapp.

    Complete Permit 8308695 $$$ $245,000
  5. Feb 1985

    Install new partitins, doors, trim, cabinets plumbing.

    Complete Permit 8501793 $$$ $355,000
  6. Jan 1986

    Install new partitions, ceilings, electrical. & tel. outlets.

    Complete Permit 8600286 $$$ $225,000
  7. Jan 1986

    New partitions installation.

    Complete Permit 8600961 $$$ $210,000
  8. Apr 1986

    Install new partitions, suspended ceiling, lighting.

    Cancelled Permit 8604328 $$$ $220,000
  9. Jun 1987

    Install new partitions, doors, cabinets, trim, ceiling.

    Complete Permit 8708258 $$$ $350,000
  10. Apr 1988

    Install new partitions, doors, cabinets, trim @ 3rd floor.

    Complete Permit 8804749 $$$ $231,000
  11. Dec 1989

    Install new aprtitions, doors, power and tel outlet/finishes.

    Expired Permit 8925134 $$$ $275,000
  12. Sep 1992

    Cti 2 fl 4 (el sp).

    Expired Permit 9216751 $$$ $300,000
  13. Sep 2011

    Int. t i for new pharmacy drug store. work includes new partitions, bathrooms, fixtures, finishes, mechanical, lighting and plumbing. no exterior work. fire protection under separate permit. all shelving and racking under separate permit.

    Complete Permit 201109013753 $$$ $500,000
  14. Sep 2011

    Basement & 1st floors-demolition interior door & walls, add accessible ramp entrance, add new doors, add new hvac at roof, add waste/water line/pipes, add new electrical & phone system.

    Complete Permit 201109023829 $$$ $222,000
  15. Dec 2012

    Demolition of existing non-load bearing interior partitions, doors & finishes. new construction of ceiling heights. partitions, doors & finishes. mep under separate permit.

    Complete Permit 201212216724 $$$ $208,000
  16. Jun 2014

    Voluntary seismic improvements to existing 16 story building. no exterior work. no work in existing lobby; upgrade existing mezzanine bathrooms. new lula elevator, new monumental stair. maher-compliance with ordinance no.155-13. not required.

    Complete Permit 201406097893 $$$ $1,150,000
  17. Sep 2015

    On mezz floor (2nd floor) build fire conference rooms, breakroom, new elevator, hvac and finishes maher not req.

    Complete Permit 201509156942 $$$ $275,000
  18. Dec 2015

    12th floor suite 1200 - demolition non-structural partition walls & ceiling grid. build new office, 4 display storage. new break room for staff use & new light. n/a maher ordinance.

    Complete Permit 201512084504 $$$ $130,000
  19. Dec 2019

    3rd floor: tenant imrpovement with restroom improvement for accessibility.

    Complete Permit 201912230433 $$$ $99,643
  20. Dec 2019

    2nd floor: tenant imrpovement with restroom improvement for accessibility.

    Complete Permit 201912230434 $$$ $100,449
  21. Jul 2020

    G/f: elevatory lobby: finish & lighting upgrades. scope includes new floor finish at exterior entry and upgraded elevator cab finishes. title 24 calculations included in permit set.

    Complete Permit 202007210565 $$$ $200,000
  22. Oct 2020

    4/f: spec tenant improvement with restroom improvement for accessibility.

    Complete Permit 202010206951 $$$ $99,643
  23. Sep 2021

    Interior office reconfiguration with break room suite 1110 minor upgrade of e elevator lobby and common fire rated corridor accessibility upgrade of e restrooms.

    Complete Permit 202109299478 $$$ $118,963
  24. Oct 2021

    5/f: spec tenant improvement with restroom improvement for accessibility. maher n/a.

    Complete Permit 202110180680 $$$ $170,466
  25. Dec 2022

    T.i. of basement space includes new non-load bearing partitions, millwork and finishes. all modifications to mechanical, electrical and plumbing systesm are deferred. convert existing basement to gym.

    Issued Permit 202212289240 $$$ $165,000
  26. Dec 2025

    Ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wall.

    Issued Permit 202512232502 $$$ $80,000
  27. May 2026

    Ref 202604159509- 15/fl- ti to serve as a business suite for new business tenants to include new interior fit out including offices, conference rooms, restrooms, and pantry with seating.

    Issued Permit 202605191492 $$$ $1,645,900

DBI holds 212 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 212. 7 of them are nominal $1 street-space or sidewalk permits.

Nearby