400–410 California Street
Financial District · San Francisco, CA 94104
Permit history
-
Oct 1981
Additions alterations or repairs.
-
Sep 1984
Replacement of concrete ribs on the exterior of the building.
-
Jul 1990
Removal, replace &/or repair existing facade damage.
-
Sep 1990
Tenant alteration of 6/f drywall partitions, acoustical ceng.
-
Jan 1998
Cti-1 11thfl, el, me, l/s, sp.
-
Jan 1998
Oti-1 17th floor el me l/s sp.
-
May 1998
Provide t/i including mechanical electrical & plumbing.
-
Sep 1998
Oti-1 el, me, ls, sp, 13th floor.
-
Jul 2000
One stop-, tenant improvement to 12th fl. install new offices in same area upgrade toilet f/acc.
-
Dec 2001
Provide t/i for 18th & 19/f per plans includd mechanical electrical & plumbing.
-
May 2003
New interior shell space @9th fl. partition, ceiling, ele, mechanical.plum, newcompliant restrms/finishes.
-
Aug 2005
Oti-1, 7th floor, el, me, ls, sp.
-
Sep 2006
Oti-1 2nd floor el me ls sp.
-
Nov 2007
Replace existing structural supports for window washing davits at parapet of 18 & 19 floors roof top. not visible from street.
-
Aug 2008
Replacement of existing chiller and associate mechanical and electrical equipment.
-
May 2010
Fire alarm retrofit for entire building.
-
Apr 2011
Basement 1 & ground level - leed ci tenant improvement. demolish all non-structural partitions, suspended ceiling, finishes, electrical, mechanical, & plumbing, replace with new on b1 level. install new mechanical sys on ground fl lobby.
-
Nov 2011
Tenant improvement to existing office space. remodel existing restrooms to accomodate disabled access in the 14th and 16th floors. alteration to existing elevator lobby on the 14th floor to accomodate disabled access.
-
Aug 2012
20th & 21st fl-demolition ofexistingcooling towers&concrete supports. demolition concrete roof.relocate exhaust fans.install new cooling towers&piping.electrical wk associated with c.t &fan installation. new building maintenance unit.install new steel equip platform.no ada wk.alarm&sprinkler defered permit.
-
Sep 2012
Tenant improvement on the 15th fl including demolition, drywall, millwork, finishes, electric and mechanical. all doors and office fronts by dirh systems under separate permit.
-
Feb 2013
Office t.i. of empty shell space on b.1 level. minor electrical for new furniture and lighting. minor hvac connecting to existing system inside space.
-
Jun 2014
Installation of new 20th floor mechanical platform and screen and 1st floor fluid oil pump room in preparation for installation of new emergency standy generator under separate permit; install new transformer on 8th floor.ups room; compliance with ord 155-13 not required.
-
Apr 2018
Voluntary seismic strengthening: selective removal and replacement of structural walls, framing, etc. **n/a for maher**.
-
Apr 2018
Architectural/landscape of removal and replacement of non-structural partitions, ceilings, architectural finishes, landscape(as required) to accomodate voluntary seismic strengthening. mep seperate permit.**maher n/a** n.b. see 2018-0423-7048 for structural aspects. roof occ load 307.
-
Oct 2018
Mechanical, electrical and plumbing removal and replacement of mechanical and electrical distribution and lighting as required to accommodate voluntary seismic stregthening under sep permit 201804242160.
DBI holds 322 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 322. 20 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. The assessor's roll gives 1907; the city's statement on Progressive Era and early revival styles gives 1906-1908. Submit an update