Permit history
-
Sep 1982
Building use: office.
-
Apr 1997
Ct1-1 el me sp (26th floor).
-
May 2002
New fire alarm system.
-
Feb 2005
Oti-1, 23rd floor, el, me, ls, sp.
-
Jul 2005
Oti-1 2/f el, me, ls, sp.
-
Jun 2010
Demolition of 536 lineal ft of drywall partition apprx. 5, 700 sq ft of acoustic ceiling. install 480 lin.ft of drywall partition, 5, 700 sq ft of acoustic ceiling grid & tile. new doors & frames & lighting. upgrade the existing restroom to fully compliant. mep; fire alarm; sprinkler; under separate permit.
-
Dec 2010
15th floor: tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting, new power and new finishes.associated mechanical, electrical and fire life safety to be design built and performed under seperate permit. no structural work to be performed.
-
Jun 2013
Demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits.
-
Nov 2013
Selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling and light fixt, millwork, finishes. accessible restrooms for full barrier removal. unoccupied space.
-
Feb 2014
T.i. full 10/f: selective demolition. new ceiling/lighting, power/data/finishes, full demolition of restrooms & new accessible restroom for barrier removal with new ceiling, lights, power, data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at new staircase area.
-
Jun 2014
Suite 950: demolition of 2 tenant suites on 7th fl. new walls n elevator lobby, power and tele data, ceiling light fixtures and millwork & finishes. full demolition of restrooms. buildout of access restrooms, full barrier removal with ceiling, electrical, finishes. sp- fa sep. permit.
-
Nov 2014
19th floor: project consist of construction of new partitions, newpower & tele/data, new ceiling & light fixtures, & new millwork & finishes, also include new buildout of accessible restrooms for full barrier removal with assoc ceiling electrical & finish. demolition score under 201408113509. space is current.
-
Mar 2015
6th floor: new partitions, nw power and teledata, nw ceiling and light fixtures & nw millwork & finishes. also includes new bld out of accessible restrms to achieve full barrier removal with associated ceiling, electrical finish work. demolition under permit #201411181812. space is vacant.
-
Mar 2016
Replace existing chiller with new. same location and lighter weight. n/a ordinance #155-13.
-
Aug 2017
Suite demolition partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, electrical & finishes work. space is currentrly unoccupied.
-
May 2019
Tenant improvement demolition of non structural partitoins, new finishes, lighting, mep, fire, ls, sprinkler under sep permit.
-
Aug 2019
Ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher na.
-
Oct 2019
Suite 1400. interior tenant improvement. demolition of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, offices.
-
Dec 2019
Interoir ti including demolition of non structural partitions and finishes, new non structural partitions, millwork finishes. mechanical, electrical, plumb, fire ls deferred.
-
Nov 2021
Interior tenant improvement, new finishes and fixtures. new non struc tural partitions, finish upgrades in e restroom. mep, fire life safety under sep permit.
-
Mar 2022
Ste 2300. interior tenant improvement; minor updates new non structural partitions, finishes and lighting, mep, fire and life safety under sep permit.
-
Mar 2022
Ste 2000: interior tenant improvement: new non-structural partitions, doors, glazing frames & hardware. m.e.p., fiee safety under separate permit.
-
Nov 2022
16/f: t.i., demolition nonstructural partitions, new partitions, finishes & restroom accessibility upgrades.
-
Jul 2023
Interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgrades.
-
Jul 2023
Interior tenant improvement: demolition of non-structural partitions and finishes, new partitions, and finishes with accessibility uprgrades, mep and fire/life safety under separate permit.
DBI holds 357 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 357. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update