222–238 Sansome Street
Financial District · San Francisco, CA 94104
-
1897
Nathaniel Blaisdell took offices here.
-
1987
Built.
-
Jan 1992
Install one halon fire suppression system.
-
Feb 2000
Cut out restaurant dining rms/reconfigurate etc.
-
Nov 2011
Renovation of lobby, front desk & grand area-expand restaurant & bar, pantry of main lobby, remove existing bar, clubroom & gift shop-2nd. level-remove existing restaurant & convert to meeting space.
-
Nov 2011
Guestroom remodeling levels 38-48; mostly cosmetic. extent of construction work is limited to relocation of some minor non-bearing walls, upgrade 5% of total guestrooms to accessible units. deletion/relocation of electrical outlets.
-
Mar 2012
Relocate fitness & hotel offices from level 4 to level 3. add spa area on level 3 - elevator lobbies, women restroom & common hallway. note: building fully sprinklered. m.e.p. under separate permit.
-
Sep 2014
Tenant improvement on the 23rd fl to construct new partitions, doors, ceiling millwork, finishes and mep. life safety/sprinklers on separate permit. maher not required.
-
Sep 2014
Tenant improvement on the 24th fl to construct new partitions, doors, ceilings, millwork, finishes and mep. life safety/sprinklers on separate permit. maher not required.
-
Feb 2016
Interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13.
-
Mar 2017
Interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a **.
-
Jan 2018
Ti at basement addition of bicycle storage room and 4th floor fitness center with shower and locker rooms for tenant use.
-
Jul 2018
Lobby refresh: scope to include new ceilings, new elevator lobbies ceiling and at elevator cabs, new floor at pel and plaza and arcade lighting. maher n/a.
-
Mar 2019
Commercial amentities space on the 1st fl. demolition of non-structural partitions, casework, lighting, doors & finishes, construction includes non-structural partitions glazing, millwork lighting finishes, work includes mechanincal electrical, and minor structural.
-
Jun 2019
18th floor commercial ti - demolition non struct paritions, ceiling, lighting, finishes & millwork. construct - non struct partitions, glazing, ceiling, lighting, millwork finishes and plumbing maher na.
-
Jul 2019
38th-48th floors. renovation of guestrooms and corridors including new finishes, plumbing fixtures and flooring.
-
May 2022
Suite 1600: t.i.: demolition of existing t.i. and demising floor into 2 small suites. renovation of suite including new partitions, suspended, ceiling lighting, electrical & plumbing. maher n/a.
-
Aug 2022
Suite 1650: tenant improvement to include selective demolition and construction of non load bearing partitoins. ceiling grid and tile, new light fixtures, new office doors, frams. salvage and r euse e selected materials if practicable. new millwork, new finishes, assoc mechanical, ele, plumb.
-
Jul 2023
12/f-suite 1260: selective demolition and construction of non load bearing partitions to ceiling grid. relocate and new light fixtures. new office doors. frames, millwork, finishes.
-
Dec 2023
31/f: demolition of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing.
-
Mar 2024
28th fl, ste 2875 project involves modification of existing ti to include selective demolition & construction of non-load bearing partitions, existing modifications to ceiling grid & tile, new light fixtures, new office doors, frmaes, salvage & reuse of existing selectied materials if practiceable, millwork and new.
-
Feb 2025
24th floor/suite 2400: existing t.i.: demolition and construction of non-loading bearing partitions; new partitions new ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; new doors/frames/hardware, millwork and finishes. include mep. all other required.
-
Aug 2025
32nd floor. demolition non-structural partitions, ceilings, finishes & hardware. interior t.i. non structural partitions and glazing, new doors and hardware. mechanical, electrical and plumbing. restroom renovations.
-
Nov 2025
Recommencement and completion of work approved under permit application: 202103086103, 202009234825, and 202305228281.
-
Nov 2025
25th fl: interior ti- conference room, pantry & restrooms. demolition of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mep.
-
Jun 2026
10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittal.
-
Jul 2026
20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm shell condition. restroom upgrades and new lighting.
DBI holds 194 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 194. 6 of them are nominal $1 street-space or sidewalk permits. A citywide context statement took offices in a building at this address in 1897; the assessor's roll dates the structure on this parcel to 1987. Whether the building described still stands here is unsettled.
Nearby
- 217–221 Sansome Street Same street
- 231 Sansome Street Same street
- 200–206 Sansome Street Same block
- 351 California Street Same block
- 345 California Street Same block
- 200–216 Pine Street Same block
- 401–425 California Street Around the corner
- 330–332 Pine Street Around the corner