Permit history
-
Oct 1983
New drywall partition's.
-
Feb 1985
Construction of undeveloped interior area.
-
Oct 1985
Tenant development in new building.
-
Apr 1986
Tenant development no change in occupancy.
-
May 1986
Interior work wall, ceilings, plumbing, electrical.
-
May 1987
Tenant improvement, walls, doors.
-
Oct 2006
Fire alarm retrofit, upgrade headend, replace devices as needed, replace devices on all floors, repalcing headend on 1/f.
-
May 2008
Full floor ti's for floors 5, 8, 9, 10 all identical layout. to demolition existing doors, partions walls to reconstruct at new doors, partions a wall. mechanical, electrical and plmg work. fire safety to be done under seperate permit.
-
Mar 2012
Tenant improvement consists of demolition of non structural partitions. provide new non structural partitions, doors, glazing, and finishes. install new power/tele/data. rework existing and lighting. add moveable partition.
-
May 2013
25th floor-complete build-out with new non structural partitions, doors, glazing, ceiling, lighting & casework. internal stairs. life safety, fire sprinklers under seperate permits.
-
Sep 2014
Tenant improvement on the 23rd fl to construct new partitions, doors, ceiling millwork, finishes and mep. life safety/sprinklers on separate permit. maher not required.
-
Jun 2016
Arch/mep construction of new non-structural partitions, doors, frames & hard ware, ceiling grid & tiles, millwork and new men's restroom. there is no change in area. life safety & sprinklers under separate permit. demolition under separate permit 2016-0412-4535. maher na.
-
Jul 2018
7th fl - demolition of partition doors, flooring, ceiling, lighting. build back of offices, conference rooms, huddles, phone rooms & a break room. ref #201802232072. a3 assembly space & lounge. field check/verify; card reader located on internal stairway between 6th / 7th floor.(not path of egress).
-
Jun 2019
18th floor commercial ti - demolition non struct paritions, ceiling, lighting, finishes & millwork. construct - non struct partitions, glazing, ceiling, lighting, millwork finishes and plumbing maher na.
-
Sep 2021
30th fl: demolition of non-structural partitions, ceilings, finishes & hardwarre. new interior non-structural partitions & glazing, new doors & hardware, new lighting & ceiling, walls finishes & floor, new mep.
-
May 2022
Suite 1600: t.i.: demolition of existing t.i. and demising floor into 2 small suites. renovation of suite including new partitions, suspended, ceiling lighting, electrical & plumbing. maher n/a.
-
Dec 2023
31/f: demolition of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing.
-
Feb 2025
24th floor/suite 2400: existing t.i.: demolition and construction of non-loading bearing partitions; new partitions new ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; new doors/frames/hardware, millwork and finishes. include mep. all other required.
-
Jul 2025
8/fl- ref 202507030167- interior ti to include new partitions, millwork, and mep upgrades. install new phone booths.
-
Sep 2025
Floor 5: common amenity suite for use by building tenants, includes two conference rooms, pantry, storage, lounge with break area and golf simulator. upgrades to existing mens/womens restroom, new womens restroom, wellness room, two vacant tenant suites & rated corridor.
-
Sep 2025
Floor 5, new exterior pedestral deck over existing roof structure. extension of interior corridor to new exterior.
-
Nov 2025
25th fl: interior ti- conference room, pantry & restrooms. demolition of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mep.
-
Dec 2025
T.i. improvement on the 27th floor. to include removal of existing partitions, finishes, ceilings, and architectural elements. construction of new partitions and ceilings. mep deferred.
-
Dec 2025
23/fl- expansion and modification of existing ti to include demolition and construction of non load bearing partitions, new ceiling grid and tile, new light fixtures, office doors/frames, power/data, salvage and reuse of existing materials, millwork and finishes.
-
Jun 2026
10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittal.
DBI holds 1,010 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 1,010. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. The assessor records 345 California Street as built in 1987; Wikipedia records 345 California Center's completion year as 1986. Submit an update